- Area
- Devon
- Postcode district
- PL19
- Nation
- England
- Nearby
- Plymouth, Saltash, Launceston
We cover Tavistock and nearby Plymouth, Saltash and the rest of Devon. A heat pump is a whole-system change, so the survey looks at radiators, pipework, the hot water cylinder and the best spot for the outdoor unit.
Heat pump services in Tavistock
All services in Tavistock:
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Tavistock quote.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Heat pump guide prices in Tavistock
These are guide prices for Devon, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,600–£12,650 | £2,100–£5,150 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,600–£13,650 | £3,100–£6,150 |
| 3 bedroom semi or small detached | 6–9 kW | £12,100–£15,650 | £4,600–£8,150 |
| 4 bedroom detached | 8–12 kW | £14,150–£18,200 | £6,650–£10,700 |
| 5+ bedroom or larger older house | 11–16 kW | £16,650–£22,750 | £9,150–£15,250 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Short winter days in Tavistock and what they mean
Tavistock sees roughly 7 hours 59 minutes of daylight in late December against 16 hours 28 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
Heat pumps in Tavistock: questions
How long does a heat pump survey take in Tavistock?
A home survey in Tavistock usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Do you cover Plymouth as well as Tavistock?
Yes. We arrange surveys and installation in Plymouth, which is about 12 miles south of Tavistock, and across Devon.
What size heat pump does a Tavistock home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Tavistock home.
Do I need new radiators for a heat pump in Tavistock?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Tavistock home gives a room-by-room list.

