- Area
- West Yorkshire
- Postcode district
- BD19
- Nation
- England
- Nearby
- Liversedge, Brighouse, Mirfield
Homes in Cleckheaton and the wider BD19 district can book a free survey for installation enquiries. Nearby we also cover Liversedge (about 2 miles south-east) and Brighouse.
Heat pump services in Cleckheaton
All services in Cleckheaton:
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Cleckheaton quote.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Heat pump guide prices in Cleckheaton
Guide prices for Cleckheaton and the rest of West Yorkshire are shown below, installed and inc VAT. We publish ranges rather than a single figure because design details move the price, and the written quote after survey fixes it.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,300–£12,250 | £1,800–£4,750 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,300–£13,250 | £2,800–£5,750 |
| 3 bedroom semi or small detached | 6–9 kW | £11,750–£15,200 | £4,250–£7,700 |
| 4 bedroom detached | 8–12 kW | £13,700–£17,650 | £6,200–£10,150 |
| 5+ bedroom or larger older house | 11–16 kW | £16,150–£22,050 | £8,650–£14,550 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Winter daylight and heating in Cleckheaton
Cleckheaton sees roughly 7 hours 25 minutes of daylight in December and 17 hours 05 minutes in June. With a longer heating season than the south, the gains from low flow temperatures and good controls add up over the year.
Heat pumps in Cleckheaton: questions
How long does a heat pump survey take in Cleckheaton?
A home survey in Cleckheaton usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How long does installation take in Cleckheaton?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Cleckheaton home states the expected time.
Do you cover Liversedge as well as Cleckheaton?
Yes. We arrange surveys and installation in Liversedge, which is about 2 miles south-east of Cleckheaton, and across West Yorkshire.
Can you service a heat pump in Cleckheaton that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Cleckheaton, whoever fitted them. Tell us the make and model when you book.

