Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Gas boiler to heat pump
Warwickshire · CV11

Gas boiler to heat pump in Nuneaton

We cover Nuneaton and the wider CV11 district for replacing a gas boiler with a heat pump. Start with a guide price online, then a free home survey for installation enquiries confirms the design.

Area
Warwickshire
Postcode district
CV11
Nation
England
Guide price
From £9,500 inc VAT
Survey
Free for installation enquiries

What to know about replacing a gas boiler with a heat pump in Nuneaton

In Nuneaton, as anywhere in the UK, the heat pumps that perform well are the ones designed around low flow temperatures and sized from a proper heat loss calculation.

Households across Warwickshire moving off gas can have a survey in Nuneaton that compares running costs on realistic assumptions. Semi-detached and terraced houses in Nuneaton often have an airing cupboard that can be reused for a heat pump cylinder.

Moving from mains gas to a heat pump means finding cylinder space, deciding what happens to the gas supply and comparing running costs on realistic assumptions.

  • System or regular boiler homes with an existing airing cupboard
  • Boilers that are old, unreliable or due for replacement
  • Combi owners who can find space for a hot water cylinder

What's included

  • Commissioning, MCS certificate and grant application in England and Wales where eligible
  • Free survey with heat loss calculation and cylinder siting
  • Removal of the gas boiler, flue and any loft tanks
  • Heat pump cylinder, outdoor unit and weather compensation controls
  • System flush and radiator upgrades where the design calls for them

Rear gardens and side returns in Nuneaton usually offer a sensible spot for the outdoor unit, checked for airflow and neighbours.

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Nuneaton quote.

There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.

Gas boiler to heat pump costs around Nuneaton

These are guide prices for Warwickshire, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.

Gas boiler to heat pump costs around Nuneaton
HomeTypical sizeInstalled guide priceAfter £7,500 grant
1–2 bedroom flat or small terrace4–5 kW£9,500–£12,500£2,000–£5,000
2–3 bedroom terrace or semi5–7 kW£10,500–£13,500£3,000–£6,000
3 bedroom semi or small detached6–9 kW£12,000–£15,500£4,500–£8,000
4 bedroom detached8–12 kW£14,000–£18,000£6,500–£10,500
5+ bedroom or larger older house11–16 kW£16,500–£22,500£9,000–£15,000

Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.

Winter daylight and heating in Nuneaton

7 h 39 minDaylight on the shortest day
16 h 50 minDaylight on the longest day
14°Noon sun height in December
52.52°NLatitude of Nuneaton

Nuneaton has about 7 hours 39 minutes of daylight at midwinter and 16 hours 50 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.

From survey to switch-on in Nuneaton

  1. Start online with a guide price or call us.
  2. A home survey in Nuneaton gives us the room-by-room heat loss.
  3. Your written quote sets out the design, the price and the grant position where you live.
  4. Installation is booked for dates that suit you; most homes take 2–4 days on site.
  5. After commissioning you get a handover of the controls and settings, plus the certificates.

Replacing a gas boiler with a heat pump in Nuneaton: questions

Do I need new radiators for a heat pump in Nuneaton?

Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Nuneaton home gives a room-by-room list.

How long does a heat pump survey take in Nuneaton?

A home survey in Nuneaton usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

How long does installation take in Nuneaton?

Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Nuneaton home states the expected time.

What if my gas boiler is fairly new?

A newer boiler can still be replaced, but the timing is worth weighing. Some owners switch when the boiler needs a major repair; others prefer to plan the change for a convenient time. Across the UK, heat pump installation is zero-rated for VAT until 31 March 2027. A hybrid system, which keeps the boiler alongside a heat pump, is another option, though it is not eligible for the Boiler Upgrade Scheme in England and Wales.

Is there a grant to replace a gas boiler with a heat pump?

In England and Wales, the Boiler Upgrade Scheme gives £7,500 towards an air-to-water heat pump that replaces a gas boiler, for eligible owners of existing homes. The MCS-certified installer applies to Ofgem and deducts the grant from your quote, and Ofgem contacts you to confirm. Scotland has separate Home Energy Scotland funding, and Northern Ireland has no dedicated homeowner grant at present.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote