Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat loss survey
Greater London · RM1

Heat loss survey in Romford

If you live in Romford and are considering heat loss surveys, the first step is a survey that measures each room. That design sets the size of the heat pump and the price in your written quote.

Area
Greater London
Postcode district
RM1
Nation
England
Guide price
Priced after survey
Survey
Free for installation enquiries

Heat loss survey in Romford: what to expect

Homes around Romford range from older terraces to newer estates, and each needs a different design. That is why we survey before we quote.

Houses in Romford built in different eras can need very different heat pump sizes, which is why each is calculated room by room. A surveyor visits your Romford home to measure each room, window and wall before any heat pump is sized.

Every heat pump we quote starts with a room-by-room heat loss survey, free with installation enquiries and also available as a stand-alone report.

  • Homeowners planning insulation or building work who want to know the effect on heat demand
  • Self-builders and architects who need emitter and system sizes early
  • Landlords comparing properties before deciding where to switch first

What's included

  • Electrical supply and network operator notes
  • Room-by-room heat loss calculation using the MCS method
  • Outdoor unit siting options and noise check
  • Written results in your quote, or a stand-alone report if you order one
  • Recommended heat pump size and design flow temperature

Homeowners in Romford thinking about insulation work can use the survey to see how it would change their heat pump size.

Grants and rules for heat pumps in England

England

Homes in Romford can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.

Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.

Guide prices for heat loss surveys in Romford

Here are typical prices for heat loss surveys in Greater London, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.

Guide prices for heat loss surveys in Romford
SurveyGuide price
Home survey and heat loss calculation with an installation quoteFree
Stand-alone heat loss survey and report£170–£450

Inc VAT. A stand-alone report is for homeowners who want the design without an installation quote.

Short winter days in Romford and what they mean

7 h 49 minDaylight on the shortest day
16 h 39 minDaylight on the longest day
15°Noon sun height in December
51.58°NLatitude of Romford

Romford sees roughly 7 hours 49 minutes of daylight in late December against 16 hours 39 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.

From survey to switch-on in Romford

  1. Send your postcode and a few details, or use the guide price tool.
  2. A surveyor visits your Romford home, measures every room and checks where the outdoor unit can go.
  3. You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
  4. Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
  5. The system is commissioned, set up with weather compensation and handed over with the paperwork.

Heat loss surveys in Romford: questions

What size heat pump does a Romford home need?

It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Romford home.

Where would the outdoor unit go on a Romford house?

Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Romford home.

How long does installation take in Romford?

Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Romford home states the expected time.

How long does a heat loss survey take?

A typical survey takes 1–3 hours on site, depending on the size and complexity of the home. Larger or older houses with mixed construction, extensions or many rooms take longer. The calculations and design are completed afterwards, and the results are included in your quote or stand-alone report.

Will the survey check noise from the outdoor unit?

Yes. The surveyor identifies possible positions for the outdoor unit and carries out the MCS noise assessment, which estimates the sound level at the nearest neighbouring window from the unit's sound power level, distance and any barriers. In England, meeting the MCS planning standards is one of the conditions for permitted development. Wales, Scotland and Northern Ireland have their own rules, which we check.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote