Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat pump grants
County Down · BT23

Heat pump grants in Comber

Heat pump funding in Comber: there is no dedicated heat pump grant for homeowners in Northern Ireland at present, so your quote shows the full price, and we check whether any Northern Ireland programme is open when you enquire.

Area
County Down
Postcode district
BT23
Nation
Northern Ireland
Main grant
No dedicated heat pump grant at present
Survey
Free for installation enquiries

Heat pump grants in Comber: what to expect

Every property in Comber is different, so the design starts from measurements rather than a rule of thumb. That keeps the system the right size and the running costs predictable.

Installation dates in Comber are fixed around any funding confirmation, so work does not start too early. For landlords with property in Comber, we explain the funding position for each home before quoting.

Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.

  • Anyone unsure which scheme applies and wanting it checked before committing

What's included

  • MCS certificate and handover documents after installation
  • Written quote showing the full price and any grant deduction
  • Eligibility check for the scheme that covers your nation
  • Installation scheduled around your grant confirmation or funding offer

Oil and LPG-heated homes around Comber can have their options set out alongside the cost of a full system.

Grants and rules for heat pumps in Northern Ireland

Northern Ireland

The Boiler Upgrade Scheme covers England and Wales only, and there is currently no dedicated heat pump grant for homeowners in Northern Ireland. Our quote for a Comber home is therefore shown without a grant deduction; if support becomes available we will tell you how it applies.

There is no VAT on installing a heat pump in Northern Ireland until 31 March 2027, the same as in Great Britain. Planning and building control here follow Northern Ireland's own rules, so the survey checks the unit position against them.

Grants and VAT across the UK

Grants and VAT across the UK
NationMain support for heat pumpsKey points
EnglandBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air)MCS-certified installer applies; deducted from your quote
WalesBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027)Same scheme and rules as England
ScotlandHome Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500You apply; written offer needed before work starts
Northern IrelandNo dedicated heat pump grant for homeowners at presentSome heat pumps funded through NISEP in the past

Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.

Winter daylight and heating in Comber

7 h 15 minDaylight on the shortest day
17 h 16 minDaylight on the longest day
12°Noon sun height in December
54.55°NLatitude of Comber

On the shortest day Comber gets only about 7 hours 15 minutes of daylight and the noon sun sits around 12° above the horizon. Northern winters tend to be longer, so a well-designed, efficient system matters more here because it runs for more of the year.

What happens after you enquire in Comber?

  1. Send your postcode and a few details, or use the guide price tool.
  2. A surveyor visits your Comber home, measures every room and checks where the outdoor unit can go.
  3. You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
  4. Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
  5. The system is commissioned, set up with weather compensation and handed over with the paperwork.

Heat pump grants in Comber: questions

Where would the outdoor unit go on a Comber house?

Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Comber home.

Do I need new radiators for a heat pump in Comber?

Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Comber home gives a room-by-room list.

How long does a heat pump survey take in Comber?

A home survey in Comber usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

Is VAT charged on heat pump installations?

Across the UK, including Northern Ireland, the installation of heat pumps is zero-rated for VAT until 31 March 2027, which means no VAT is added to a qualifying installation. Our guide prices are shown including VAT on that basis. Your written quote shows how VAT applies to each item of work, so there are no surprises on the final invoice.

How much is the heat pump grant?

It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote