- Area
- County Down
- Postcode district
- BT35
- Nation
- Northern Ireland
- Main grant
- No dedicated heat pump grant at present
- Survey
- Free for installation enquiries
Before you book: heat pump grants in Newry
Most homes can run on a heat pump if the system is designed properly, and Newry is no different. The key is matching the heat pump and radiators to the home's heat loss.
We confirm at the survey which funding route a home in Newry is likely to qualify for. For landlords with property in Newry, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Anyone unsure which scheme applies and wanting it checked before committing
What's included
- Installation scheduled around your grant confirmation or funding offer
- MCS certificate and handover documents after installation
- Eligibility check for the scheme that covers your nation
- Written quote showing the full price and any grant deduction
Installation dates in Newry are fixed around any funding confirmation, so work does not start too early.
Grants and rules for heat pumps in Northern Ireland
The Boiler Upgrade Scheme covers England and Wales only, and there is currently no dedicated heat pump grant for homeowners in Northern Ireland. Our quote for a Newry home is therefore shown without a grant deduction; if support becomes available we will tell you how it applies.
Installing heat pumps has been zero-rated for VAT in Northern Ireland since 1 May 2023, in line with the rest of the UK, until 31 March 2027. Northern Ireland has its own permitted development rules and building regulations, and we confirm what applies to your Newry property at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Newry
Newry sees roughly 7 hours 20 minutes of daylight in December and 17 hours 11 minutes in June. With a longer heating season than the south, the gains from low flow temperatures and good controls add up over the year.
The steps for heat pump grants in Newry
- Tell us about your home: postcode, property type and current heating.
- We book a survey in Newry; the surveyor measures rooms, windows and radiators and looks at cylinder space.
- The design and quote arrive in writing, including radiator changes and the outdoor unit position.
- On installation days the old system is removed and the new one fitted and filled.
- We commission the heat pump, show you the controls and register the installation.
Heat pump grants in Newry: questions
Where would the outdoor unit go on a Newry house?
Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Newry home.
How long does installation take in Newry?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Newry home states the expected time.
How long does a heat pump survey take in Newry?
A home survey in Newry usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.
Is VAT charged on heat pump installations?
Across the UK, including Northern Ireland, the installation of heat pumps is zero-rated for VAT until 31 March 2027, which means no VAT is added to a qualifying installation. Our guide prices are shown including VAT on that basis. Your written quote shows how VAT applies to each item of work, so there are no surprises on the final invoice.

