- Area
- Edinburgh and the Lothians
- Postcode district
- EH41
- Nation
- Scotland
- Main grant
- Home Energy Scotland, up to £7,500
- Survey
- Free for installation enquiries
Heat pump grants in Haddington: what to expect
A heat pump suits most Haddington homes, but the details decide how efficiently it runs. Our survey looks at insulation, radiators and hot water use room by room.
Homeowners in Haddington get a clear written quote showing the full price and any funding that applies. Installation dates in Haddington are fixed around any funding confirmation, so work does not start too early.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Scottish homeowners applying through Home Energy Scotland, including rural and island homes
- Anyone unsure which scheme applies and wanting it checked before committing
What's included
- Eligibility check for the scheme that covers your nation
- MCS certificate and handover documents after installation
- Quote and technical details for Home Energy Scotland applications (Scotland)
- Installation scheduled around your grant confirmation or funding offer
- Written quote showing the full price and any grant deduction
For landlords with property in Haddington, we explain the funding position for each home before quoting.
Grants and rules for heat pumps in Scotland
In Scotland, heat pump funding comes through Home Energy Scotland rather than the Boiler Upgrade Scheme: a grant of up to £7,500 (up to £1,500 extra for eligible rural and island homes) and an optional interest-free loan of up to £7,500. For a Haddington home, apply and receive the written offer before the installation date is fixed.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Scotland has its own permitted development rules for air source heat pumps and its own building standards, so we confirm what applies to your Haddington property at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Short winter days in Haddington and what they mean
Haddington has about 6 hours 57 minutes of daylight at midwinter against 17 hours 37 minutes in midsummer. Heat pumps are designed to keep working well below freezing, but the design temperature for the survey is set for local conditions, not an average day.
From survey to switch-on in Haddington
- Send your postcode and a few details, or use the guide price tool.
- A surveyor visits your Haddington home, measures every room and checks where the outdoor unit can go.
- You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
- Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
- The system is commissioned, set up with weather compensation and handed over with the paperwork.
Heat pump grants in Haddington: questions
How long does installation take in Haddington?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Haddington home states the expected time.
How long does a heat pump survey take in Haddington?
A home survey in Haddington usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How soon can you survey a home in Haddington?
Survey dates depend on how busy installers are in Edinburgh and the Lothians. We offer the next available dates when you enquire and confirm them in writing.
Can I start work before my Home Energy Scotland offer arrives?
No. In Scotland you must receive a written funding offer from Home Energy Scotland before work starts, otherwise the work may not be funded. We plan the installation date only once your offer is confirmed. Funding is first come, first served, so it helps to apply once you have your written quote.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

