- Area
- Edinburgh and the Lothians
- Postcode district
- EH54
- Nation
- Scotland
- Main grant
- Home Energy Scotland, up to £7,500
- Survey
- Free for installation enquiries
Heat pump grants for Livingston homes
Every property in Livingston is different, so the design starts from measurements rather than a rule of thumb. That keeps the system the right size and the running costs predictable.
We confirm at the survey which funding route a home in Livingston is likely to qualify for. For landlords with property in Livingston, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Scottish homeowners applying through Home Energy Scotland, including rural and island homes
- Anyone unsure which scheme applies and wanting it checked before committing
What's included
- MCS certificate and handover documents after installation
- Eligibility check for the scheme that covers your nation
- Quote and technical details for Home Energy Scotland applications (Scotland)
- Installation scheduled around your grant confirmation or funding offer
- Written quote showing the full price and any grant deduction
Across Livingston and Edinburgh and the Lothians, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in Scotland
In Scotland, heat pump funding comes through Home Energy Scotland rather than the Boiler Upgrade Scheme: a grant of up to £7,500 (up to £1,500 extra for eligible rural and island homes) and an optional interest-free loan of up to £7,500. For a Livingston home, apply and receive the written offer before the installation date is fixed.
There is no VAT on installing a heat pump anywhere in the UK, Scotland included, until 31 March 2027. Scottish permitted development rules and building standards apply, and the surveyor checks the unit position and any listed or conservation-area constraints.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Designing for Livingston's winters
Livingston has about 6 hours 58 minutes of daylight at midwinter against 17 hours 36 minutes in midsummer. Heat pumps are designed to keep working well below freezing, but the design temperature for the survey is set for local conditions, not an average day.
How installation works in Livingston
- Tell us about your home: postcode, property type and current heating.
- We book a survey in Livingston; the surveyor measures rooms, windows and radiators and looks at cylinder space.
- The design and quote arrive in writing, including radiator changes and the outdoor unit position.
- On installation days the old system is removed and the new one fitted and filled.
- We commission the heat pump, show you the controls and register the installation.
Heat pump grants in Livingston: questions
Do you cover Broxburn as well as Livingston?
Yes. We arrange surveys and installation in Broxburn, which is about 3 miles north-east of Livingston, and across Edinburgh and the Lothians.
Do I need new radiators for a heat pump in Livingston?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Livingston home gives a room-by-room list.
How long does installation take in Livingston?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Livingston home states the expected time.
Can I start work before my Home Energy Scotland offer arrives?
No. In Scotland you must receive a written funding offer from Home Energy Scotland before work starts, otherwise the work may not be funded. We plan the installation date only once your offer is confirmed. Funding is first come, first served, so it helps to apply once you have your written quote.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

