- Area
- Gwent
- Postcode district
- NP12
- Nation
- Wales
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Before you book: heat pump grants in Blackwood
A heat pump suits most Blackwood homes, but the details decide how efficiently it runs. Our survey looks at insulation, radiators and hot water use room by room.
Across Blackwood and Gwent, the paperwork for funding applications is prepared alongside your quote. For landlords with property in Blackwood, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Landlords in England and Wales, who can apply for their let properties
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
- Anyone unsure which scheme applies and wanting it checked before committing
What's included
- MCS certificate and handover documents after installation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Written quote showing the full price and any grant deduction
- Installation scheduled around your grant confirmation or funding offer
- Eligibility check for the scheme that covers your nation
Oil and LPG-heated homes around Blackwood can have their options set out alongside the cost of a full system.
Grants and rules for heat pumps in Wales
In Wales the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027; £2,500 for air-to-air). The MCS-certified installer named in your quote applies to Ofgem for you, and the grant comes off your Blackwood quote.
There is no VAT on installing a heat pump anywhere in the UK, Wales included, until 31 March 2027. Planning rules for heat pumps in Wales are set by the Welsh Government and differ from England's, so the surveyor checks the unit position against them.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Blackwood
Blackwood has about 7 hours 48 minutes of daylight at midwinter and 16 hours 40 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
From survey to switch-on in Blackwood
- Tell us about your home: postcode, property type and current heating.
- We book a survey in Blackwood; the surveyor measures rooms, windows and radiators and looks at cylinder space.
- The design and quote arrive in writing, including radiator changes and the outdoor unit position.
- On installation days the old system is removed and the new one fitted and filled.
- We commission the heat pump, show you the controls and register the installation.
Heat pump grants in Blackwood: questions
How long does a heat pump survey take in Blackwood?
A home survey in Blackwood usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How soon can you survey a home in Blackwood?
Survey dates depend on how busy installers are in Gwent. We offer the next available dates when you enquire and confirm them in writing.
What size heat pump does a Blackwood home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Blackwood home.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

