Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat pump grants
Hampshire · GU11

Heat pump grants in Aldershot

Grants can take a large share off the cost of a heat pump in Aldershot. We explain the scheme that applies, what it needs from you, and how it appears on your quote.

Area
Hampshire
Postcode district
GU11
Nation
England
Main grant
Boiler Upgrade Scheme, £7,500
Survey
Free for installation enquiries

Heat pump grants in Aldershot: what to expect

Most homes can run on a heat pump if the system is designed properly, and Aldershot is no different. The key is matching the heat pump and radiators to the home's heat loss.

Homeowners in Aldershot get a clear written quote showing the full price and any funding that applies. We confirm at the survey which funding route a home in Aldershot is likely to qualify for.

Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.

  • Anyone unsure which scheme applies and wanting it checked before committing
  • Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
  • Landlords in England and Wales, who can apply for their let properties

What's included

  • MCS certificate and handover documents after installation
  • Installation scheduled around your grant confirmation or funding offer
  • Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
  • Written quote showing the full price and any grant deduction
  • Eligibility check for the scheme that covers your nation

Installation dates in Aldershot are fixed around any funding confirmation, so work does not start too early.

Grants and rules for heat pumps in England

England

Homes in Aldershot can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.

Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.

Grants and VAT across the UK

Grants and VAT across the UK
NationMain support for heat pumpsKey points
EnglandBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air)MCS-certified installer applies; deducted from your quote
WalesBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027)Same scheme and rules as England
ScotlandHome Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500You apply; written offer needed before work starts
Northern IrelandNo dedicated heat pump grant for homeowners at presentSome heat pumps funded through NISEP in the past

Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.

Short winter days in Aldershot and what they mean

7 h 52 minDaylight on the shortest day
16 h 35 minDaylight on the longest day
15°Noon sun height in December
51.25°NLatitude of Aldershot

On the shortest day Aldershot gets about 7 hours 52 minutes of daylight, and the winter sun reaches only around 15° above the horizon at noon. Winters this far south are milder than in most of the UK, which helps a heat pump run at low flow temperatures for much of the season.

From survey to switch-on in Aldershot

  1. Start online with a guide price or call us.
  2. A home survey in Aldershot gives us the room-by-room heat loss.
  3. Your written quote sets out the design, the price and the grant position where you live.
  4. Installation is booked for dates that suit you; most homes take 2–4 days on site.
  5. After commissioning you get a handover of the controls and settings, plus the certificates.

Heat pump grants in Aldershot: questions

Do I need new radiators for a heat pump in Aldershot?

Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Aldershot home gives a room-by-room list.

How long does installation take in Aldershot?

Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for an Aldershot home states the expected time.

How long does a heat pump survey take in Aldershot?

A home survey in Aldershot usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

Who applies for the Boiler Upgrade Scheme?

In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

Do I need an EPC for the Boiler Upgrade Scheme?

No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote