Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat pump grants
Merseyside · L32

Heat pump grants in Kirkby

Help with heat pump funding in Kirkby and the L32 district: eligibility checked at survey, grant shown on the quote, and the paperwork handled where the installer applies.

Area
Merseyside
Postcode district
L32
Nation
England
Main grant
Boiler Upgrade Scheme, £7,500
Survey
Free for installation enquiries

Heat pump grants in Kirkby: what to expect

A heat pump suits most Kirkby homes, but the details decide how efficiently it runs. Our survey looks at insulation, radiators and hot water use room by room.

Oil and LPG-heated homes around Kirkby can have their options set out alongside the cost of a full system. Across Kirkby and Merseyside, the paperwork for funding applications is prepared alongside your quote.

Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.

  • Anyone unsure which scheme applies and wanting it checked before committing
  • Homeowners in England and Wales replacing gas, oil, LPG or electric heating
  • Homes in England and Wales on oil or LPG, where a higher grant applies between set dates

What's included

  • Written quote showing the full price and any grant deduction
  • Installation scheduled around your grant confirmation or funding offer
  • MCS certificate and handover documents after installation
  • Eligibility check for the scheme that covers your nation
  • Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)

We confirm at the survey which funding route a home in Kirkby is likely to qualify for.

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Kirkby quote.

Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.

Grants and VAT across the UK

Grants and VAT across the UK
NationMain support for heat pumpsKey points
EnglandBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air)MCS-certified installer applies; deducted from your quote
WalesBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027)Same scheme and rules as England
ScotlandHome Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500You apply; written offer needed before work starts
Northern IrelandNo dedicated heat pump grant for homeowners at presentSome heat pumps funded through NISEP in the past

Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.

Winter daylight and heating in Kirkby

7 h 28 minDaylight on the shortest day
17 h 02 minDaylight on the longest day
13°Noon sun height in December
53.48°NLatitude of Kirkby

On the shortest day Kirkby gets only about 7 hours 28 minutes of daylight and the noon sun sits around 13° above the horizon. Northern winters tend to be longer, so a well-designed, efficient system matters more here because it runs for more of the year.

The steps for heat pump grants in Kirkby

  1. Tell us about your home: postcode, property type and current heating.
  2. We book a survey in Kirkby; the surveyor measures rooms, windows and radiators and looks at cylinder space.
  3. The design and quote arrive in writing, including radiator changes and the outdoor unit position.
  4. On installation days the old system is removed and the new one fitted and filled.
  5. We commission the heat pump, show you the controls and register the installation.

Heat pump grants in Kirkby: questions

Can you service a heat pump in Kirkby that someone else installed?

Yes. We arrange servicing and repairs for most air source heat pumps in Kirkby, whoever fitted them. Tell us the make and model when you book.

Do you cover Maghull as well as Kirkby?

Yes. We arrange surveys and installation in Maghull, which is about 3 miles north-west of Kirkby, and across Merseyside.

How long does installation take in Kirkby?

Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Kirkby home states the expected time.

Do I need an EPC for the Boiler Upgrade Scheme?

No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

Who applies for the Boiler Upgrade Scheme?

In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote