- Area
- North Yorkshire
- Postcode district
- DL7
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Before you book: heat pump grants in Northallerton
Most homes can run on a heat pump if the system is designed properly, and Northallerton is no different. The key is matching the heat pump and radiators to the home's heat loss.
Homeowners in Northallerton get a clear written quote showing the full price and any funding that applies. Oil and LPG-heated homes around Northallerton can have their options set out alongside the cost of a full system.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Landlords in England and Wales, who can apply for their let properties
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
What's included
- Eligibility check for the scheme that covers your nation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Written quote showing the full price and any grant deduction
- Installation scheduled around your grant confirmation or funding offer
- MCS certificate and handover documents after installation
For landlords with property in Northallerton, we explain the funding position for each home before quoting.
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Northallerton quote.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Short winter days in Northallerton and what they mean
Northallerton sees roughly 7 hours 18 minutes of daylight in December and 17 hours 13 minutes in June. With a longer heating season than the south, the gains from low flow temperatures and good controls add up over the year.
How installation works in Northallerton
- Send your postcode and a few details, or use the guide price tool.
- A surveyor visits your Northallerton home, measures every room and checks where the outdoor unit can go.
- You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
- Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
- The system is commissioned, set up with weather compensation and handed over with the paperwork.
Heat pump grants in Northallerton: questions
What size heat pump does a Northallerton home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Northallerton home.
Can you service a heat pump in Northallerton that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Northallerton, whoever fitted them. Tell us the make and model when you book.
How long does installation take in Northallerton?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Northallerton home states the expected time.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

