- Area
- Renfrewshire and Inverclyde
- Postcode district
- PA5
- Nation
- Scotland
- Main grant
- Home Energy Scotland, up to £7,500
- Survey
- Free for installation enquiries
What to know about heat pump grants in Johnstone
Homes around Johnstone range from older terraces to newer estates, and each needs a different design. That is why we survey before we quote.
Oil and LPG-heated homes around Johnstone can have their options set out alongside the cost of a full system. For landlords with property in Johnstone, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Anyone unsure which scheme applies and wanting it checked before committing
- Scottish homeowners applying through Home Energy Scotland, including rural and island homes
What's included
- Written quote showing the full price and any grant deduction
- MCS certificate and handover documents after installation
- Quote and technical details for Home Energy Scotland applications (Scotland)
- Eligibility check for the scheme that covers your nation
- Installation scheduled around your grant confirmation or funding offer
We confirm at the survey which funding route a home in Johnstone is likely to qualify for.
Grants and rules for heat pumps in Scotland
The Boiler Upgrade Scheme does not apply in Scotland. Instead, homeowners in Johnstone can apply to Home Energy Scotland for a grant of up to £7,500 towards a heat pump, with up to £1,500 more for eligible rural and island homes, plus an optional interest-free loan of up to £7,500. You need a written funding offer before any work starts.
There is no VAT on installing a heat pump anywhere in the UK, Scotland included, until 31 March 2027. Scottish permitted development rules and building standards apply, and the surveyor checks the unit position and any listed or conservation-area constraints.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Short winter days in Johnstone and what they mean
On the shortest day Johnstone gets only about 6 hours 59 minutes of daylight, with the sun around 11° up at noon. Long Scottish winters mean the heat pump runs for much of the year, so careful sizing, good controls and correctly sized radiators make a real difference.
What happens after you enquire in Johnstone?
- Send your postcode and a few details, or use the guide price tool.
- A surveyor visits your Johnstone home, measures every room and checks where the outdoor unit can go.
- You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
- Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
- The system is commissioned, set up with weather compensation and handed over with the paperwork.
Heat pump grants in Johnstone: questions
How soon can you survey a home in Johnstone?
Survey dates depend on how busy installers are in Renfrewshire and Inverclyde. We offer the next available dates when you enquire and confirm them in writing.
How long does installation take in Johnstone?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Johnstone home states the expected time.
Where would the outdoor unit go on a Johnstone house?
Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Johnstone home.
Can I start work before my Home Energy Scotland offer arrives?
No. In Scotland you must receive a written funding offer from Home Energy Scotland before work starts, otherwise the work may not be funded. We plan the installation date only once your offer is confirmed. Funding is first come, first served, so it helps to apply once you have your written quote.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

