- Area
- Somerset
- Postcode district
- BA4
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Heat pump grants for Shepton Mallet homes
The question for a Shepton Mallet home is rarely whether a heat pump can work, but what needs to change to make it work well: radiator sizes, pipework, controls and where the unit goes.
Oil and LPG-heated homes around Shepton Mallet can have their options set out alongside the cost of a full system. For landlords with property in Shepton Mallet, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Anyone unsure which scheme applies and wanting it checked before committing
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
What's included
- Eligibility check for the scheme that covers your nation
- Installation scheduled around your grant confirmation or funding offer
- Written quote showing the full price and any grant deduction
- MCS certificate and handover documents after installation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
Across Shepton Mallet and Somerset, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in England
Homes in Shepton Mallet can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Shepton Mallet
Shepton Mallet sees roughly 7 hours 53 minutes of daylight in late December against 16 hours 35 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
How installation works in Shepton Mallet
- Start online with a guide price or call us.
- A home survey in Shepton Mallet gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Shepton Mallet: questions
How soon can you survey a home in Shepton Mallet?
Survey dates depend on how busy installers are in Somerset. We offer the next available dates when you enquire and confirm them in writing.
How long does installation take in Shepton Mallet?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Shepton Mallet home states the expected time.
Do I need new radiators for a heat pump in Shepton Mallet?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Shepton Mallet home gives a room-by-room list.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

