- Area
- Tyne and Wear
- Postcode district
- NE1
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Heat pump grants in Newcastle upon Tyne: what to expect
The question for a Newcastle upon Tyne home is rarely whether a heat pump can work, but what needs to change to make it work well: radiator sizes, pipework, controls and where the unit goes.
Across Newcastle upon Tyne and Tyne and Wear, the paperwork for funding applications is prepared alongside your quote. We confirm at the survey which funding route a home in Newcastle upon Tyne is likely to qualify for.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Anyone unsure which scheme applies and wanting it checked before committing
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
What's included
- Installation scheduled around your grant confirmation or funding offer
- Eligibility check for the scheme that covers your nation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Written quote showing the full price and any grant deduction
- MCS certificate and handover documents after installation
For landlords with property in Newcastle upon Tyne, we explain the funding position for each home before quoting.
Grants and rules for heat pumps in England
Homes in Newcastle upon Tyne can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Designing for Newcastle upon Tyne's winters
On the shortest day Newcastle upon Tyne gets only about 7 hours 10 minutes of daylight and the noon sun sits around 12° above the horizon. Northern winters tend to be longer, so a well-designed, efficient system matters more here because it runs for more of the year.
How installation works in Newcastle upon Tyne
- Start online with a guide price or call us.
- A home survey in Newcastle upon Tyne gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Newcastle upon Tyne: questions
Do you cover Wallsend as well as Newcastle upon Tyne?
Yes. We arrange surveys and installation in Wallsend, which is about 3 miles east of Newcastle upon Tyne, and across Tyne and Wear.
How long does a heat pump survey take in Newcastle upon Tyne?
A home survey in Newcastle upon Tyne usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How long does installation take in Newcastle upon Tyne?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Newcastle upon Tyne home states the expected time.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

