- Area
- West Midlands
- Postcode district
- B15
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Before you book: heat pump grants in Edgbaston
Most homes can run on a heat pump if the system is designed properly, and Edgbaston is no different. The key is matching the heat pump and radiators to the home's heat loss.
Homeowners in Edgbaston get a clear written quote showing the full price and any funding that applies. Across Edgbaston and the West Midlands, the paperwork for funding applications is prepared alongside your quote.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Landlords in England and Wales, who can apply for their let properties
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
What's included
- MCS certificate and handover documents after installation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Installation scheduled around your grant confirmation or funding offer
- Eligibility check for the scheme that covers your nation
- Written quote showing the full price and any grant deduction
Installation dates in Edgbaston are fixed around any funding confirmation, so work does not start too early.
Grants and rules for heat pumps in England
Homes in Edgbaston can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Edgbaston
Edgbaston has about 7 hours 40 minutes of daylight at midwinter and 16 hours 49 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
From survey to switch-on in Edgbaston
- Start online with a guide price or call us.
- A home survey in Edgbaston gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Edgbaston: questions
Do I need new radiators for a heat pump in Edgbaston?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Edgbaston home gives a room-by-room list.
How soon can you survey a home in Edgbaston?
Survey dates depend on how busy installers are in the West Midlands. We offer the next available dates when you enquire and confirm them in writing.
How long does a heat pump survey take in Edgbaston?
A home survey in Edgbaston usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

