It is important to be clear about funding. In England and Wales, hybrid systems are not eligible for the Boiler Upgrade Scheme, which requires the heat pump to meet the home's full heating and hot water needs. You also keep a fossil-fuel boiler, its servicing and, on mains gas, the standing charge. We set out both options at survey so you can compare a hybrid with a full heat pump fairly.
Larger, older houses in Somerset that would need a very big heat pump may suit a hybrid while insulation is improved. In Somerset, the outdoor unit of a hybrid needs the same airflow and siting care as any heat pump. For Somerset homes with a boiler that is still fairly new, a hybrid lets a heat pump take on much of the heating now.
Who it suits
- Combi homes with no room for a cylinder
- Large or hard-to-insulate homes where a full heat pump is difficult for now
- Owners who want a stepping stone towards a full heat pump later
- Homes with a fairly new boiler the owner wants to keep using
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your quote.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Hybrid heat pumps prices in Somerset
These are guide prices for Somerset, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.
| System | Installed guide price |
|---|---|
| Hybrid heat pump alongside an existing boiler | £7,000–£11,000 |
Installed, inc VAT. Hybrid systems are not eligible for the Boiler Upgrade Scheme.
Towns we cover in Somerset
We cover 17 towns in Somerset for hybrid heat pumps. Each links to local guide prices and the grant position for England.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Bath | BA1 | Keynsham | 7 h 51 min |
| Weston-super-Mare | BS23 | Burnham-on-Sea | 7 h 51 min |
| Taunton | TA1 | Bridgwater | 7 h 54 min |
| Yeovil | BA20 | Sherborne | 7 h 55 min |
| Bridgwater | TA6 | Burnham-on-Sea | 7 h 53 min |
| Portishead | BS20 | Nailsea | 7 h 50 min |
| Frome | BA11 | Warminster | 7 h 52 min |
| Burnham-on-Sea | TA8 | Weston-super-Mare | 7 h 52 min |
| Clevedon | BS21 | Nailsea | 7 h 50 min |
| Nailsea | BS48 | Portishead | 7 h 50 min |
| Keynsham | BS31 | Kingswood | 7 h 50 min |
| Chard | TA20 | Taunton | 7 h 56 min |
| Glastonbury | BA6 | Street | 7 h 53 min |
| Minehead | TA24 | Burnham-on-Sea | 7 h 53 min |
| Shepton Mallet | BA4 | Wells | 7 h 53 min |
| Street | BA16 | Glastonbury | 7 h 53 min |
| Wells | BA5 | Shepton Mallet | 7 h 52 min |
Hybrid heat pumps questions
Can I get the Boiler Upgrade Scheme grant for a hybrid heat pump?
No. In England and Wales hybrid systems are not eligible for the Boiler Upgrade Scheme, because the scheme requires the heat pump to meet the home's full heating and hot water needs on its own. If a grant matters to your budget, a full air-to-water heat pump is the option that can qualify. In Scotland and Northern Ireland we check at survey what, if any, funding applies.
Does a hybrid switch between heat sources automatically?
Yes. The hybrid controller follows rules set at commissioning: it might switch to the boiler below a chosen outdoor temperature, compare running costs using the prices you enter, or prioritise lower carbon. Some systems run both together in very cold weather. The installer sets these for your home and shows you how to adjust them when tariffs change.
Can a hybrid work with my combi boiler?
Yes, some hybrids are designed to work with a combi, with the heat pump heating the radiators and the combi continuing to provide hot water on demand. That avoids finding space for a cylinder, which is one of the main reasons people choose a hybrid. Other hybrid designs use a cylinder heated by the heat pump, with the boiler as backup.
Is a hybrid a good step towards a full heat pump?
It can be, if the outdoor unit and pipework are sized with a future full system in mind. Later, once insulation has improved or radiators have been upgraded, the boiler can be removed and the system converted, provided the heat pump is large enough for the full load. Raise this at survey so the design leaves room to change.

