Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Oil and LPG boiler replacement
West Midlands · B90

Oil and LPG boiler replacement in Shirley

Looking into replacing an oil or LPG boiler with a heat pump for a home in Shirley? We look at the whole heating system — emitters, pipework, cylinder space and controls — so the heat pump can run efficiently.

Area
West Midlands
Postcode district
B90
Nation
England
Guide price
From £9,500 inc VAT
Survey
Free for installation enquiries

Oil and LPG boiler replacement for Shirley homes

In Shirley, as anywhere in the UK, the heat pumps that perform well are the ones designed around low flow temperatures and sized from a proper heat loss calculation.

Bungalows and detached houses near Shirley running on LPG can move to a heat pump, with the tank collected by the supplier. If your home near Shirley is off the mains gas grid, a heat pump removes the need for oil or LPG deliveries.

Off-gas homes have a lot to plan when switching to a heat pump: the fuel tank, older walls, rural power supplies and higher heat loss.

  • Owners tired of fuel deliveries and tank maintenance
  • Older oil boilers nearing the end of their life
  • Eligible homes in England and Wales within the higher grant window

What's included

  • Help arranging LPG tank collection with your supplier
  • Outdoor unit, heat pump cylinder, controls and radiator changes
  • Oil tank draining and removal or making safe, as set out in your quote
  • MCS certificate and grant application in England and Wales where eligible
  • Free survey with a detailed heat loss calculation for older construction

Owners across the West Midlands can have oil tank removal arranged alongside a heat pump installation in Shirley.

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Shirley quote.

There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.

Guide prices for replacing an oil or LPG boiler with a heat pump in Shirley

The ranges below are typical installed prices for homes in the West Midlands, including VAT. A survey sets the exact figure, because two similar-looking houses in Shirley can need quite different radiators and pipework.

Guide prices for replacing an oil or LPG boiler with a heat pump in Shirley
HomeTypical sizeInstalled guide priceAfter £9,000 grant
1–2 bedroom flat or small terrace4–5 kW£9,500–£12,500£500–£3,500
2–3 bedroom terrace or semi5–7 kW£10,500–£13,500£1,500–£4,500
3 bedroom semi or small detached6–9 kW£12,000–£15,500£3,000–£6,500
4 bedroom detached8–12 kW£14,000–£18,000£5,000–£9,000
5+ bedroom or larger older house11–16 kW£16,500–£22,500£7,500–£13,500

Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. The £9,000 Boiler Upgrade Scheme figure applies to oil and LPG replacements in England and Wales installed from 21 July 2026 to 31 March 2027.

How long is the heating season in Shirley?

7 h 40 minDaylight on the shortest day
16 h 49 minDaylight on the longest day
14°Noon sun height in December
52.41°NLatitude of Shirley

On the shortest day Shirley gets about 7 hours 40 minutes of daylight, with the noon sun around 14° up. The heating season runs from autumn into spring, so a heat pump that is sized correctly and set up with weather compensation does most of its work in steady, cool conditions.

From survey to switch-on in Shirley

  1. Send your postcode and a few details, or use the guide price tool.
  2. A surveyor visits your Shirley home, measures every room and checks where the outdoor unit can go.
  3. You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
  4. Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
  5. The system is commissioned, set up with weather compensation and handed over with the paperwork.

Replacing an oil or LPG boiler with a heat pump in Shirley: questions

How soon can you survey a home in Shirley?

Survey dates depend on how busy installers are in the West Midlands. We offer the next available dates when you enquire and confirm them in writing.

How long does a heat pump survey take in Shirley?

A home survey in Shirley usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

Where would the outdoor unit go on a Shirley house?

Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Shirley home.

Do I have to remove my oil tank?

Not always, but it should be emptied and made safe. A tank in good condition can be drained, cleaned and left in place, though most owners prefer to have it taken away to free up space. Old or damaged tanks are usually removed. Your quote says which option is included, and any remaining oil and sludge is disposed of properly.

What happens with a leased LPG tank?

Leased LPG tanks belong to the supplier, so the supplier arranges collection. Check your contract for notice periods and any charges before you fix a date. We time the switchover so you are not left without heating, and once the heat pump is commissioned the supplier can empty and remove the tank. Bottled LPG cylinders are simply returned.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote