- Area
- Greater London
- Postcode district
- SM4
- Nation
- England
- Guide price
- From £10,650 inc VAT
- Survey
- Free for installation enquiries
What to know about air source heat pump installation in Morden
Homes around Morden range from older terraces to newer estates, and each needs a different design. That is why we survey before we quote.
Terraced streets in Morden often mean a compact unit position at the rear, so siting and sound levels are checked carefully. For older properties in Morden, the heat loss calculation looks closely at solid walls, single glazing and draughts before any unit is sized.
We survey your home, design a heat pump system around its real heat loss, and manage the installation from the first visit to the MCS certificate.
- Homes replacing a gas, oil, LPG or electric heating system
- Owners who want one contract covering design, fitting and paperwork
- Households with room for a hot water cylinder
What's included
- System design, unit sizing and a written quote
- Free home survey and room-by-room heat loss calculation
- Boiler Upgrade Scheme application in England and Wales where eligible
- Removal of the old boiler or heaters
- Commissioning, handover and a walk-through of the controls
In Morden, cylinder space is planned with you, often in an airing cupboard, utility room or garage.
Grants and rules for heat pumps in England
Homes in Morden can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Air source heat pump installation prices in Morden
The ranges below are typical installed prices for homes in Greater London, including VAT. A survey sets the exact figure, because two similar-looking houses in Morden can need quite different radiators and pipework.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £10,650–£14,000 | £3,150–£6,500 |
| 2–3 bedroom terrace or semi | 5–7 kW | £11,750–£15,100 | £4,250–£7,600 |
| 3 bedroom semi or small detached | 6–9 kW | £13,450–£17,350 | £5,950–£9,850 |
| 4 bedroom detached | 8–12 kW | £15,700–£20,150 | £8,200–£12,650 |
| 5+ bedroom or larger older house | 11–16 kW | £18,500–£25,200 | £11,000–£17,700 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Winter daylight and heating in Morden
Morden sees roughly 7 hours 51 minutes of daylight in late December against 16 hours 37 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
How installation works in Morden
- Send your postcode and a few details, or use the guide price tool.
- A surveyor visits your Morden home, measures every room and checks where the outdoor unit can go.
- You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
- Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
- The system is commissioned, set up with weather compensation and handed over with the paperwork.
Air source heat pump installation in Morden: questions
Do you cover Mitcham as well as Morden?
Yes. We arrange surveys and installation in Mitcham, which is about a mile east of Morden, and across Greater London.
What size heat pump does a Morden home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Morden home.
How long does installation take in Morden?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Morden home states the expected time.
Will an air source heat pump be noisy?
Heat pumps are designed to run quietly, but where the unit sits makes a real difference. The survey looks for a position away from bedroom windows and neighbours, with clear airflow, and the installation must pass the MCS noise assessment. The fan is most noticeable on very cold days when the unit works hardest, and a little vapour during the periodic defrost is normal.
Can I cancel after accepting the quote?
Nothing is ordered until you accept the written quote. Where the contract is agreed away from our premises, for example at your kitchen table, you can cancel within 14 days under the Consumer Contracts Regulations 2013. If you ask us to start sooner and then cancel, you pay only for work done up to that point.

