- Area
- County Armagh
- Postcode district
- BT63
- Nation
- Northern Ireland
- Nearby
- Portadown, Craigavon, Lurgan
From Tandragee out to Portadown and Craigavon, we arrange heat pump surveys, installation and aftercare across County Armagh. Each job is designed around the home's measured heat loss.
Heat pump services in Tandragee
All services in Tandragee:
Grants and rules for heat pumps in Northern Ireland
Northern Ireland does not have a dedicated heat pump grant for homeowners at present, and the Boiler Upgrade Scheme does not apply here. Heat pumps have sometimes been funded through the Northern Ireland Sustainable Energy Programme, so it is worth checking what is open when you enquire about a home in Tandragee.
Installing heat pumps has been zero-rated for VAT in Northern Ireland since 1 May 2023, in line with the rest of the UK, until 31 March 2027. Northern Ireland has its own permitted development rules and building regulations, and we confirm what applies to your Tandragee property at survey.
Heat pump guide prices in Tandragee
These are guide prices for County Armagh, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.
| Home | Typical size | Installed guide price |
|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,200–£12,150 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,200–£13,100 |
| 3 bedroom semi or small detached | 6–9 kW | £11,650–£15,050 |
| 4 bedroom detached | 8–12 kW | £13,600–£17,450 |
| 5+ bedroom or larger older house | 11–16 kW | £16,000–£21,850 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. No dedicated heat pump grant currently applies in Northern Ireland.
Designing for Tandragee's winters
On the shortest day Tandragee gets only about 7 hours 18 minutes of daylight and the noon sun sits around 12° above the horizon. Northern winters tend to be longer, so a well-designed, efficient system matters more here because it runs for more of the year.
Heat pumps in Tandragee: questions
Where would the outdoor unit go on a Tandragee house?
Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Tandragee home.
What size heat pump does a Tandragee home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Tandragee home.
How long does a heat pump survey take in Tandragee?
A home survey in Tandragee usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How long does installation take in Tandragee?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Tandragee home states the expected time.

