- Area
- Dyfed
- Postcode district
- SA72
- Nation
- Wales
- Nearby
- Milford Haven, Haverfordwest, Tenby
Pembroke Dock is in Dyfed, and the nearest towns we also cover include Milford Haven and Haverfordwest. Whether you are replacing a gas, oil or electric system, the design starts with measuring how much heat each room loses on a cold day.
Heat pump services in Pembroke Dock
All services in Pembroke Dock:
Grants and rules for heat pumps in Wales
In Wales the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027; £2,500 for air-to-air). The MCS-certified installer named in your quote applies to Ofgem for you, and the grant comes off your Pembroke Dock quote.
There is no VAT on installing a heat pump anywhere in the UK, Wales included, until 31 March 2027. Planning rules for heat pumps in Wales are set by the Welsh Government and differ from England's, so the surveyor checks the unit position against them.
Heat pump guide prices in Pembroke Dock
Guide prices for Pembroke Dock and the rest of Dyfed are shown below, installed and inc VAT. We publish ranges rather than a single figure because design details move the price, and the written quote after survey fixes it.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,500–£12,500 | £2,000–£5,000 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,500–£13,500 | £3,000–£6,000 |
| 3 bedroom semi or small detached | 6–9 kW | £12,000–£15,500 | £4,500–£8,000 |
| 4 bedroom detached | 8–12 kW | £14,000–£18,000 | £6,500–£10,500 |
| 5+ bedroom or larger older house | 11–16 kW | £16,500–£22,500 | £9,000–£15,000 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Designing for Pembroke Dock's winters
Pembroke Dock has about 7 hours 48 minutes of daylight at midwinter and 16 hours 40 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
Heat pumps in Pembroke Dock: questions
How long does installation take in Pembroke Dock?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Pembroke Dock home states the expected time.
How soon can you survey a home in Pembroke Dock?
Survey dates depend on how busy installers are in Dyfed. We offer the next available dates when you enquire and confirm them in writing.
How long does a heat pump survey take in Pembroke Dock?
A home survey in Pembroke Dock usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Can you service a heat pump in Pembroke Dock that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Pembroke Dock, whoever fitted them. Tell us the make and model when you book.

