Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat loss survey
Shropshire · TF9

Heat loss survey in Market Drayton

We cover Market Drayton and the surrounding Shropshire area for heat loss surveys, with installation carried out by installers we appoint and manage under one contract.

Area
Shropshire
Postcode district
TF9
Nation
England
Guide price
Priced after survey
Survey
Free for installation enquiries

Before you book: heat loss surveys in Market Drayton

The question for a Market Drayton home is rarely whether a heat pump can work, but what needs to change to make it work well: radiator sizes, pipework, controls and where the unit goes.

A surveyor visits your Market Drayton home to measure each room, window and wall before any heat pump is sized. Houses in Market Drayton built in different eras can need very different heat pump sizes, which is why each is calculated room by room.

Every heat pump we quote starts with a room-by-room heat loss survey, free with installation enquiries and also available as a stand-alone report.

  • Homeowners planning insulation or building work who want to know the effect on heat demand
  • Self-builders and architects who need emitter and system sizes early
  • Anyone getting a heat pump quote, as the first step

What's included

  • Radiator schedule with any upgrades needed for each room
  • Recommended heat pump size and design flow temperature
  • Room-by-room heat loss calculation using the MCS method
  • Outdoor unit siting options and noise check
  • Electrical supply and network operator notes

For Market Drayton homes with extensions or loft conversions, each part of the house is assessed on its own construction.

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Market Drayton quote.

Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.

What to budget for heat loss surveys in Market Drayton

Here are typical prices for heat loss surveys in Shropshire, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.

What to budget for heat loss surveys in Market Drayton
SurveyGuide price
Home survey and heat loss calculation with an installation quoteFree
Stand-alone heat loss survey and report£150–£400

Inc VAT. A stand-alone report is for homeowners who want the design without an installation quote.

How long is the heating season in Market Drayton?

7 h 35 minDaylight on the shortest day
16 h 55 minDaylight on the longest day
14°Noon sun height in December
52.91°NLatitude of Market Drayton

On the shortest day Market Drayton gets about 7 hours 35 minutes of daylight, with the noon sun around 14° up. The heating season runs from autumn into spring, so a heat pump that is sized correctly and set up with weather compensation does most of its work in steady, cool conditions.

From survey to switch-on in Market Drayton

  1. Start online with a guide price or call us.
  2. A home survey in Market Drayton gives us the room-by-room heat loss.
  3. Your written quote sets out the design, the price and the grant position where you live.
  4. Installation is booked for dates that suit you; most homes take 2–4 days on site.
  5. After commissioning you get a handover of the controls and settings, plus the certificates.

Heat loss surveys in Market Drayton: questions

What size heat pump does a Market Drayton home need?

It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Market Drayton home.

How long does a heat pump survey take in Market Drayton?

A home survey in Market Drayton usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

Can you service a heat pump in Market Drayton that someone else installed?

Yes. We arrange servicing and repairs for most air source heat pumps in Market Drayton, whoever fitted them. Tell us the make and model when you book.

Can I use the heat loss report to get other quotes?

Yes. A stand-alone heat loss report is yours to use, including sharing it with other installers so their quotes are based on the same figures. Comparing quotes like for like makes it easier to see differences in equipment, radiator upgrades and workmanship terms. The report states the assumptions used wherever construction could not be confirmed.

How long does a heat loss survey take?

A typical survey takes 1–3 hours on site, depending on the size and complexity of the home. Larger or older houses with mixed construction, extensions or many rooms take longer. The calculations and design are completed afterwards, and the results are included in your quote or stand-alone report.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote