- Area
- Shropshire
- Postcode district
- TF9
- Nation
- England
- Nearby
- Nantwich, Newcastle-under-Lyme, Telford
From Market Drayton out to Nantwich and Newcastle-under-Lyme, we arrange heat pump surveys, installation and aftercare across Shropshire. Each job is designed around the home's measured heat loss.
Heat pump services in Market Drayton
All services in Market Drayton:
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Market Drayton quote.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Heat pump guide prices in Market Drayton
These are guide prices for Shropshire, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,500–£12,500 | £2,000–£5,000 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,500–£13,500 | £3,000–£6,000 |
| 3 bedroom semi or small detached | 6–9 kW | £12,000–£15,500 | £4,500–£8,000 |
| 4 bedroom detached | 8–12 kW | £14,000–£18,000 | £6,500–£10,500 |
| 5+ bedroom or larger older house | 11–16 kW | £16,500–£22,500 | £9,000–£15,000 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Short winter days in Market Drayton and what they mean
Market Drayton has about 7 hours 35 minutes of daylight at midwinter and 16 hours 55 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
Heat pumps in Market Drayton: questions
What size heat pump does a Market Drayton home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Market Drayton home.
How long does installation take in Market Drayton?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Market Drayton home states the expected time.
How soon can you survey a home in Market Drayton?
Survey dates depend on how busy installers are in Shropshire. We offer the next available dates when you enquire and confirm them in writing.
Do I need new radiators for a heat pump in Market Drayton?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Market Drayton home gives a room-by-room list.

