- Area
- Argyll and Bute
- Postcode district
- PA20
- Nation
- Scotland
- Main grant
- Home Energy Scotland, up to £7,500
- Survey
- Free for installation enquiries
Heat pump grants in Rothesay: what to expect
The question for a Rothesay home is rarely whether a heat pump can work, but what needs to change to make it work well: radiator sizes, pipework, controls and where the unit goes.
Installation dates in Rothesay are fixed around any funding confirmation, so work does not start too early. We confirm at the survey which funding route a home in Rothesay is likely to qualify for.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Anyone unsure which scheme applies and wanting it checked before committing
- Scottish homeowners applying through Home Energy Scotland, including rural and island homes
What's included
- Quote and technical details for Home Energy Scotland applications (Scotland)
- Eligibility check for the scheme that covers your nation
- Written quote showing the full price and any grant deduction
- Installation scheduled around your grant confirmation or funding offer
- MCS certificate and handover documents after installation
Across Rothesay and Argyll and Bute, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in Scotland
The Boiler Upgrade Scheme does not apply in Scotland. Instead, homeowners in Rothesay can apply to Home Energy Scotland for a grant of up to £7,500 towards a heat pump, with up to £1,500 more for eligible rural and island homes, plus an optional interest-free loan of up to £7,500. You need a written funding offer before any work starts.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Scotland has its own permitted development rules for air source heat pumps and its own building standards, so we confirm what applies to your Rothesay property at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Rothesay
Rothesay has about 6 hours 59 minutes of daylight at midwinter against 17 hours 35 minutes in midsummer. Heat pumps are designed to keep working well below freezing, but the design temperature for the survey is set for local conditions, not an average day.
What happens after you enquire in Rothesay?
- Tell us about your home: postcode, property type and current heating.
- We book a survey in Rothesay; the surveyor measures rooms, windows and radiators and looks at cylinder space.
- The design and quote arrive in writing, including radiator changes and the outdoor unit position.
- On installation days the old system is removed and the new one fitted and filled.
- We commission the heat pump, show you the controls and register the installation.
Rothesay is in an area we cover by arrangement, so survey dates and any travel costs are confirmed individually in your quote.
Heat pump grants in Rothesay: questions
Do I need new radiators for a heat pump in Rothesay?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Rothesay home gives a room-by-room list.
How long does installation take in Rothesay?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Rothesay home states the expected time.
How long does a heat pump survey take in Rothesay?
A home survey in Rothesay usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Can I start work before my Home Energy Scotland offer arrives?
No. In Scotland you must receive a written funding offer from Home Energy Scotland before work starts, otherwise the work may not be funded. We plan the installation date only once your offer is confirmed. Funding is first come, first served, so it helps to apply once you have your written quote.
How much is the heat pump grant?
It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

