- Area
- Greater London
- Postcode district
- DA14
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Heat pump grants in Sidcup: what to expect
Most homes can run on a heat pump if the system is designed properly, and Sidcup is no different. The key is matching the heat pump and radiators to the home's heat loss.
Homeowners in Sidcup get a clear written quote showing the full price and any funding that applies. Installation dates in Sidcup are fixed around any funding confirmation, so work does not start too early.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Landlords in England and Wales, who can apply for their let properties
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
What's included
- Eligibility check for the scheme that covers your nation
- Installation scheduled around your grant confirmation or funding offer
- MCS certificate and handover documents after installation
- Written quote showing the full price and any grant deduction
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
Across Sidcup and Greater London, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in England
Homes in Sidcup can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Designing for Sidcup's winters
Sidcup sees roughly 7 hours 50 minutes of daylight in late December against 16 hours 37 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
What happens after you enquire in Sidcup?
- Start online with a guide price or call us.
- A home survey in Sidcup gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Sidcup: questions
How soon can you survey a home in Sidcup?
Survey dates depend on how busy installers are in Greater London. We offer the next available dates when you enquire and confirm them in writing.
What size heat pump does a Sidcup home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Sidcup home.
Can you service a heat pump in Sidcup that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Sidcup, whoever fitted them. Tell us the make and model when you book.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

