- Area
- Hertfordshire
- Postcode district
- HP2
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Heat pump grants for Hemel Hempstead homes
The question for a Hemel Hempstead home is rarely whether a heat pump can work, but what needs to change to make it work well: radiator sizes, pipework, controls and where the unit goes.
Oil and LPG-heated homes around Hemel Hempstead can have their options set out alongside the cost of a full system. Homeowners in Hemel Hempstead get a clear written quote showing the full price and any funding that applies.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Anyone unsure which scheme applies and wanting it checked before committing
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
- Landlords in England and Wales, who can apply for their let properties
What's included
- Eligibility check for the scheme that covers your nation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- MCS certificate and handover documents after installation
- Installation scheduled around your grant confirmation or funding offer
- Written quote showing the full price and any grant deduction
Across Hemel Hempstead and Hertfordshire, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in England
Homes in Hemel Hempstead can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Hemel Hempstead
Hemel Hempstead has about 7 hours 47 minutes of daylight at midwinter and 16 hours 41 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
What happens after you enquire in Hemel Hempstead?
- Start online with a guide price or call us.
- A home survey in Hemel Hempstead gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Hemel Hempstead: questions
What size heat pump does a Hemel Hempstead home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Hemel Hempstead home.
How long does installation take in Hemel Hempstead?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Hemel Hempstead home states the expected time.
Do I need new radiators for a heat pump in Hemel Hempstead?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Hemel Hempstead home gives a room-by-room list.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

