Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
Heat pump grants
Hertfordshire · WD7

Heat pump grants in Radlett

Which heat pump grant can a home in Radlett get? It depends on the nation you live in. We confirm the route at survey and set out the full price and any deduction in writing.

Area
Hertfordshire
Postcode district
WD7
Nation
England
Main grant
Boiler Upgrade Scheme, £7,500
Survey
Free for installation enquiries

Heat pump grants in Radlett: what to expect

Every property in Radlett is different, so the design starts from measurements rather than a rule of thumb. That keeps the system the right size and the running costs predictable.

We confirm at the survey which funding route a home in Radlett is likely to qualify for. Across Radlett and Hertfordshire, the paperwork for funding applications is prepared alongside your quote.

Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.

  • Landlords in England and Wales, who can apply for their let properties
  • Anyone unsure which scheme applies and wanting it checked before committing
  • Homeowners in England and Wales replacing gas, oil, LPG or electric heating

What's included

  • Written quote showing the full price and any grant deduction
  • MCS certificate and handover documents after installation
  • Eligibility check for the scheme that covers your nation
  • Installation scheduled around your grant confirmation or funding offer
  • Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)

Installation dates in Radlett are fixed around any funding confirmation, so work does not start too early.

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Radlett quote.

Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.

Grants and VAT across the UK

Grants and VAT across the UK
NationMain support for heat pumpsKey points
EnglandBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air)MCS-certified installer applies; deducted from your quote
WalesBoiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027)Same scheme and rules as England
ScotlandHome Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500You apply; written offer needed before work starts
Northern IrelandNo dedicated heat pump grant for homeowners at presentSome heat pumps funded through NISEP in the past

Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.

Designing for Radlett's winters

7 h 48 minDaylight on the shortest day
16 h 40 minDaylight on the longest day
15°Noon sun height in December
51.69°NLatitude of Radlett

On the shortest day Radlett gets about 7 hours 48 minutes of daylight, with the noon sun around 15° up. The heating season runs from autumn into spring, so a heat pump that is sized correctly and set up with weather compensation does most of its work in steady, cool conditions.

The steps for heat pump grants in Radlett

  1. Send your postcode and a few details, or use the guide price tool.
  2. A surveyor visits your Radlett home, measures every room and checks where the outdoor unit can go.
  3. You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
  4. Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
  5. The system is commissioned, set up with weather compensation and handed over with the paperwork.

Heat pump grants in Radlett: questions

What size heat pump does a Radlett home need?

It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your Radlett home.

Do I need new radiators for a heat pump in Radlett?

Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Radlett home gives a room-by-room list.

How soon can you survey a home in Radlett?

Survey dates depend on how busy installers are in Hertfordshire. We offer the next available dates when you enquire and confirm them in writing.

Do I need an EPC for the Boiler Upgrade Scheme?

No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

How much is the heat pump grant?

It depends on where you live. In England and Wales, the Boiler Upgrade Scheme pays £7,500 towards an air-to-water heat pump, or £9,000 when replacing oil or LPG heating for installations from 21 July 2026 to 31 March 2027. In Scotland, Home Energy Scotland offers up to £7,500, plus a rural uplift and an optional loan. Northern Ireland has no dedicated grant at present.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote