- Area
- Kent
- Postcode district
- ME16
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Heat pump grants for Maidstone homes
A heat pump suits most Maidstone homes, but the details decide how efficiently it runs. Our survey looks at insulation, radiators and hot water use room by room.
Oil and LPG-heated homes around Maidstone can have their options set out alongside the cost of a full system. Across Maidstone and Kent, the paperwork for funding applications is prepared alongside your quote.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Landlords in England and Wales, who can apply for their let properties
What's included
- Eligibility check for the scheme that covers your nation
- Written quote showing the full price and any grant deduction
- Installation scheduled around your grant confirmation or funding offer
- MCS certificate and handover documents after installation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
Homeowners in Maidstone get a clear written quote showing the full price and any funding that applies.
Grants and rules for heat pumps in England
Homes in Maidstone can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
Winter daylight and heating in Maidstone
Maidstone sees roughly 7 hours 52 minutes of daylight in late December against 16 hours 36 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
The steps for heat pump grants in Maidstone
- Start online with a guide price or call us.
- A home survey in Maidstone gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in Maidstone: questions
How long does a heat pump survey take in Maidstone?
A home survey in Maidstone usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How soon can you survey a home in Maidstone?
Survey dates depend on how busy installers are in Kent. We offer the next available dates when you enquire and confirm them in writing.
Do I need new radiators for a heat pump in Maidstone?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Maidstone home gives a room-by-room list.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

