A hybrid heat pump is an air-to-water heat pump installed alongside an existing gas, LPG or oil boiler, with a controller that decides which one supplies heat at any moment. Typically the heat pump covers mild and moderate weather, and the boiler takes over or helps on the coldest days, or whenever it is cheaper to run on the prices entered into the controller.
In Clwyd, the outdoor unit of a hybrid needs the same airflow and siting care as any heat pump. Combi homes in Clwyd with no space for a cylinder can look at a hybrid that keeps the combi for hot water. A survey in Clwyd can set a hybrid against a full heat pump for owners anywhere in Clwyd.
Who it suits
- Large or hard-to-insulate homes where a full heat pump is difficult for now
- Combi homes with no room for a cylinder
- Owners who want a stepping stone towards a full heat pump later
- Homes with a fairly new boiler the owner wants to keep using
Grants and rules for heat pumps in Wales
Homes in Clwyd can use the Boiler Upgrade Scheme, which applies in Wales as well as England: £7,500 towards an air source heat pump, or £9,000 when it replaces oil or LPG heating for installations from 21 July 2026 to 31 March 2027. The MCS-certified installer named in your quote applies and deducts the grant.
There is no VAT on installing a heat pump anywhere in the UK, Wales included, until 31 March 2027. Planning rules for heat pumps in Wales are set by the Welsh Government and differ from England's, so the surveyor checks the unit position against them.
Hybrid heat pumps prices in Clwyd
Here are typical prices for hybrid heat pumps in Clwyd, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.
| System | Installed guide price |
|---|---|
| Hybrid heat pump alongside an existing boiler | £7,000–£11,000 |
Installed, inc VAT. Hybrid systems are not eligible for the Boiler Upgrade Scheme.
Towns we cover in Clwyd
We cover 16 towns in Clwyd for hybrid heat pumps. Each links to local guide prices and the grant position for Wales.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Wrexham | LL13 | Rhosllannerchrugog | 7 h 33 min |
| Buckley | CH7 | Mold | 7 h 32 min |
| Deeside | CH5 | Connah's Quay | 7 h 31 min |
| Colwyn Bay | LL29 | Conwy | 7 h 30 min |
| Flint | CH6 | Connah's Quay | 7 h 31 min |
| Rhyl | LL18 | Prestatyn | 7 h 30 min |
| Rhosllannerchrugog | LL14 | Wrexham | 7 h 33 min |
| Prestatyn | LL19 | Rhyl | 7 h 30 min |
| Llandudno | LL30 | Conwy | 7 h 30 min |
| Abergele | LL22 | Rhyl | 7 h 30 min |
| Connah's Quay | CH5 | Deeside | 7 h 31 min |
| Conwy | LL31 | Llandudno | 7 h 30 min |
| Denbigh | LL16 | Ruthin | 7 h 32 min |
| Llangollen | LL20 | Rhosllannerchrugog | 7 h 34 min |
| Mold | CH7 | Buckley | 7 h 32 min |
| Ruthin | LL15 | Denbigh | 7 h 32 min |
Hybrid heat pumps questions
Do I still need to service my boiler with a hybrid?
Yes. The boiler still needs its annual service, by a registered gas engineer for gas or LPG or an oil technician for oil, and the heat pump needs its own annual service, which is often a condition of the manufacturer's warranty. Two heat sources mean slightly more maintenance than either a boiler or a heat pump on its own.
Can a hybrid work with my combi boiler?
Yes, some hybrids are designed to work with a combi, with the heat pump heating the radiators and the combi continuing to provide hot water on demand. That avoids finding space for a cylinder, which is one of the main reasons people choose a hybrid. Other hybrid designs use a cylinder heated by the heat pump, with the boiler as backup.
Does a hybrid switch between heat sources automatically?
Yes. The hybrid controller follows rules set at commissioning: it might switch to the boiler below a chosen outdoor temperature, compare running costs using the prices you enter, or prioritise lower carbon. Some systems run both together in very cold weather. The installer sets these for your home and shows you how to adjust them when tariffs change.
Can I get the Boiler Upgrade Scheme grant for a hybrid heat pump?
No. In England and Wales hybrid systems are not eligible for the Boiler Upgrade Scheme, because the scheme requires the heat pump to meet the home's full heating and hot water needs on its own. If a grant matters to your budget, a full air-to-water heat pump is the option that can qualify. In Scotland and Northern Ireland we check at survey what, if any, funding applies.

