- Area
- Merseyside
- Postcode district
- CH41
- Nation
- England
- Guide price
- From £9,200 inc VAT
- Survey
- Free for installation enquiries
Oil and LPG boiler replacement for Birkenhead homes
Every property in Birkenhead is different, so the design starts from measurements rather than a rule of thumb. That keeps the system the right size and the running costs predictable.
Owners across Merseyside can have oil tank removal arranged alongside a heat pump installation in Birkenhead. If your home near Birkenhead is off the mains gas grid, a heat pump removes the need for oil or LPG deliveries.
Off-gas homes have a lot to plan when switching to a heat pump: the fuel tank, older walls, rural power supplies and higher heat loss.
- Eligible homes in England and Wales within the higher grant window
- Older oil boilers nearing the end of their life
- Owners tired of fuel deliveries and tank maintenance
What's included
- Free survey with a detailed heat loss calculation for older construction
- Oil tank draining and removal or making safe, as set out in your quote
- Help arranging LPG tank collection with your supplier
- MCS certificate and grant application in England and Wales where eligible
- Outdoor unit, heat pump cylinder, controls and radiator changes
Bungalows and detached houses near Birkenhead running on LPG can move to a heat pump, with the tank collected by the supplier.
Grants and rules for heat pumps in England
Homes in Birkenhead can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
What to budget for replacing an oil or LPG boiler with a heat pump in Birkenhead
The ranges below are typical installed prices for homes in Merseyside, including VAT. A survey sets the exact figure, because two similar-looking houses in Birkenhead can need quite different radiators and pipework.
| Home | Typical size | Installed guide price | After £9,000 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,200–£12,150 | £200–£3,150 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,200–£13,100 | £1,200–£4,100 |
| 3 bedroom semi or small detached | 6–9 kW | £11,650–£15,050 | £2,650–£6,050 |
| 4 bedroom detached | 8–12 kW | £13,600–£17,450 | £4,600–£8,450 |
| 5+ bedroom or larger older house | 11–16 kW | £16,000–£21,850 | £7,000–£12,850 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. The £9,000 Boiler Upgrade Scheme figure applies to oil and LPG replacements in England and Wales installed from 21 July 2026 to 31 March 2027.
Short winter days in Birkenhead and what they mean
Birkenhead has about 7 hours 29 minutes of daylight at midwinter and 17 hours 01 minutes at midsummer. That swing matters if you pair a heat pump with solar panels: summer generation can cover much of the hot water, winter generation far less.
From survey to switch-on in Birkenhead
- Send your postcode and a few details, or use the guide price tool.
- A surveyor visits your Birkenhead home, measures every room and checks where the outdoor unit can go.
- You receive a heat loss design and a fixed written quote, with any grant shown where it applies.
- Installers fit the unit, cylinder and any radiator changes, typically over 2–4 days on site.
- The system is commissioned, set up with weather compensation and handed over with the paperwork.
Replacing an oil or LPG boiler with a heat pump in Birkenhead: questions
How long does a heat pump survey take in Birkenhead?
A home survey in Birkenhead usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Can you service a heat pump in Birkenhead that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Birkenhead, whoever fitted them. Tell us the make and model when you book.
How long does installation take in Birkenhead?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Birkenhead home states the expected time.
What happens with a leased LPG tank?
Leased LPG tanks belong to the supplier, so the supplier arranges collection. Check your contract for notice periods and any charges before you fix a date. We time the switchover so you are not left without heating, and once the heat pump is commissioned the supplier can empty and remove the tank. Bottled LPG cylinders are simply returned.
Is a heat pump cheaper to run than oil?
It depends on oil prices, your home's insulation, the flow temperature and your electricity tariff, so there is no single answer. At the October to December 2026 price cap, a heat pump with a seasonal efficiency of 3.0 delivers heat for about 8.8p per kWh, and at 3.5 about 7.5p. Compare that with your oil cost per kWh of heat, allowing for your boiler's efficiency; the survey estimate gives a figure for your home.

