Heat loss survey in Leek: what to expect
A heat pump suits most Leek homes, but the details decide how efficiently it runs. Our survey looks at insulation, radiators and hot water use room by room.
Houses in Leek built in different eras can need very different heat pump sizes, which is why each is calculated room by room. A surveyor visits your Leek home to measure each room, window and wall before any heat pump is sized.
Every heat pump we quote starts with a room-by-room heat loss survey, free with installation enquiries and also available as a stand-alone report.
- Homes with an existing heat pump that seems undersized or expensive to run
- Homeowners planning insulation or building work who want to know the effect on heat demand
- Anyone getting a heat pump quote, as the first step
What's included
- Hot water cylinder sizing for your household
- Room-by-room heat loss calculation using the MCS method
- Radiator schedule with any upgrades needed for each room
- Electrical supply and network operator notes
- Outdoor unit siting options and noise check
The survey in Leek includes a check of where the outdoor unit could sit and how its sound would reach neighbours.
Grants and rules for heat pumps in England
Homes in Leek can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Heat loss survey prices in Leek
Here are typical prices for heat loss surveys in Staffordshire, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.
| Survey | Guide price |
|---|---|
| Home survey and heat loss calculation with an installation quote | Free |
| Stand-alone heat loss survey and report | £150–£400 |
Inc VAT. A stand-alone report is for homeowners who want the design without an installation quote.
How long is the heating season in Leek?
On the shortest day Leek gets about 7 hours 32 minutes of daylight, with the noon sun around 13° up. The heating season runs from autumn into spring, so a heat pump that is sized correctly and set up with weather compensation does most of its work in steady, cool conditions.
What happens after you enquire in Leek?
- Start online with a guide price or call us.
- A home survey in Leek gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat loss surveys in Leek: questions
How long does a heat pump survey take in Leek?
A home survey in Leek usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Can you service a heat pump in Leek that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Leek, whoever fitted them. Tell us the make and model when you book.
How long does installation take in Leek?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Leek home states the expected time.
How long does a heat loss survey take?
A typical survey takes 1–3 hours on site, depending on the size and complexity of the home. Larger or older houses with mixed construction, extensions or many rooms take longer. The calculations and design are completed afterwards, and the results are included in your quote or stand-alone report.
Why can't you size the heat pump from my boiler?
Boilers are often much larger than a home's real heat loss, because they are sized for fast hot water and quick warm-ups. Matching a heat pump to the boiler's output usually means an oversized unit that costs more and switches on and off too often. A room-by-room calculation finds the actual heat demand, which is what the heat pump needs to meet.