- Area
- Greater London
- Postcode district
- NW11
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Before you book: heat pump grants in Golders Green
Most homes can run on a heat pump if the system is designed properly, and Golders Green is no different. The key is matching the heat pump and radiators to the home's heat loss.
We confirm at the survey which funding route a home in Golders Green is likely to qualify for. Homeowners in Golders Green get a clear written quote showing the full price and any funding that applies.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Landlords in England and Wales, who can apply for their let properties
- Anyone unsure which scheme applies and wanting it checked before committing
What's included
- MCS certificate and handover documents after installation
- Eligibility check for the scheme that covers your nation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Written quote showing the full price and any grant deduction
- Installation scheduled around your grant confirmation or funding offer
Across Golders Green and Greater London, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in England
Homes in Golders Green can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
How long is the heating season in Golders Green?
Golders Green sees roughly 7 hours 49 minutes of daylight in late December against 16 hours 39 minutes in June. Milder southern winters suit heat pumps well, though the system is still sized for a cold snap rather than an average day.
How installation works in Golders Green
- Tell us about your home: postcode, property type and current heating.
- We book a survey in Golders Green; the surveyor measures rooms, windows and radiators and looks at cylinder space.
- The design and quote arrive in writing, including radiator changes and the outdoor unit position.
- On installation days the old system is removed and the new one fitted and filled.
- We commission the heat pump, show you the controls and register the installation.
Heat pump grants in Golders Green: questions
Do I need new radiators for a heat pump in Golders Green?
Often some, not all. Heat pumps run best at lower water temperatures, so rooms with small radiators may need larger ones. The survey of your Golders Green home gives a room-by-room list.
How long does a heat pump survey take in Golders Green?
A home survey in Golders Green usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Can you service a heat pump in Golders Green that someone else installed?
Yes. We arrange servicing and repairs for most air source heat pumps in Golders Green, whoever fitted them. Tell us the make and model when you book.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.

