- Area
- Greater London
- Postcode district
- NW6
- Nation
- England
- Main grant
- Boiler Upgrade Scheme, £7,500
- Survey
- Free for installation enquiries
Before you book: heat pump grants in West Hampstead
In West Hampstead, as anywhere in the UK, the heat pumps that perform well are the ones designed around low flow temperatures and sized from a proper heat loss calculation.
We confirm at the survey which funding route a home in West Hampstead is likely to qualify for. For landlords with property in West Hampstead, we explain the funding position for each home before quoting.
Heat pump funding depends on which UK nation you live in, so we confirm what applies to your home and handle the grant steps alongside your quote.
- Homes in England and Wales on oil or LPG, where a higher grant applies between set dates
- Homeowners in England and Wales replacing gas, oil, LPG or electric heating
- Landlords in England and Wales, who can apply for their let properties
What's included
- MCS certificate and handover documents after installation
- Boiler Upgrade Scheme application made by the MCS-certified installer (England and Wales)
- Written quote showing the full price and any grant deduction
- Eligibility check for the scheme that covers your nation
- Installation scheduled around your grant confirmation or funding offer
Across West Hampstead and Greater London, the paperwork for funding applications is prepared alongside your quote.
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your West Hampstead quote.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Grants and VAT across the UK
| Nation | Main support for heat pumps | Key points |
|---|---|---|
| England | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027; £2,500 air-to-air) | MCS-certified installer applies; deducted from your quote |
| Wales | Boiler Upgrade Scheme: £7,500 (£9,000 replacing oil or LPG, 21 July 2026 to 31 March 2027) | Same scheme and rules as England |
| Scotland | Home Energy Scotland grant up to £7,500, plus up to £1,500 rural uplift; interest-free loan up to £7,500 | You apply; written offer needed before work starts |
| Northern Ireland | No dedicated heat pump grant for homeowners at present | Some heat pumps funded through NISEP in the past |
Heat pump installation is zero-rated for VAT across the UK, including Northern Ireland, until 31 March 2027. Scheme figures as at October 2026; check gov.uk, Ofgem or Home Energy Scotland before relying on them.
How long is the heating season in West Hampstead?
On the shortest day West Hampstead gets about 7 hours 49 minutes of daylight, and the winter sun reaches only around 15° above the horizon at noon. Winters this far south are milder than in most of the UK, which helps a heat pump run at low flow temperatures for much of the season.
From survey to switch-on in West Hampstead
- Start online with a guide price or call us.
- A home survey in West Hampstead gives us the room-by-room heat loss.
- Your written quote sets out the design, the price and the grant position where you live.
- Installation is booked for dates that suit you; most homes take 2–4 days on site.
- After commissioning you get a handover of the controls and settings, plus the certificates.
Heat pump grants in West Hampstead: questions
How long does a heat pump survey take in West Hampstead?
A home survey in West Hampstead usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
Where would the outdoor unit go on a West Hampstead house?
Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your West Hampstead home.
What size heat pump does a West Hampstead home need?
It depends on the heat loss, not the postcode. As a rough guide, a 3 bedroom semi often needs 6–9 kW, but the room-by-room survey sets the actual size for your West Hampstead home.
Do I need an EPC for the Boiler Upgrade Scheme?
No longer. Since 28 April 2026, a valid EPC is not required for the Boiler Upgrade Scheme in England and Wales. The system must still meet the home's full heating and hot water needs, which the room-by-room heat loss calculation confirms. The other eligibility rules, such as owning the property, still apply.
Who applies for the Boiler Upgrade Scheme?
In England and Wales, the MCS-certified installer applies to Ofgem for the Boiler Upgrade Scheme on your behalf, and the grant is deducted from your quote. Ofgem then contacts you as the property owner to confirm the details. Your quote names the MCS-certified installer for your job, so you know who is making the application.

