Pairing a heat pump with solar PV means using electricity generated by panels on your roof to run the heat pump, so less is bought from the grid. Solar PV (photovoltaic) panels turn daylight into electricity, and a heat pump is one of the largest electrical loads in an electrically heated home, so the two are often planned together.
Roof orientation and shading vary street by street in Aberdeenshire and Moray, so solar is assessed on each roof individually. We plan heat pump and solar electrics together for Aberdeenshire and Moray homes so the consumer unit is upgraded only once. Across Aberdeenshire and Moray and Aberdeenshire and Moray, winter solar output is modest, so our heat pump designs never rely on it for heating.
Who it suits
- Homes with existing solar PV that currently export much of their output
- Homeowners planning a heat pump who want to add panels at the same time
- Households considering a battery to store daytime or cheaper overnight electricity
- Households at home during the day or with flexible hot water timing
Grants and rules for heat pumps in Scotland
The Boiler Upgrade Scheme does not apply in Scotland. Instead, homeowners in Aberdeenshire and Moray can apply to Home Energy Scotland for a grant of up to £7,500 towards a heat pump, with up to £1,500 more for eligible rural and island homes, plus an optional interest-free loan of up to £7,500. You need a written funding offer before any work starts.
There is no VAT on installing a heat pump anywhere in the UK, Scotland included, until 31 March 2027. Scottish permitted development rules and building standards apply, and the surveyor checks the unit position and any listed or conservation-area constraints.
Prices
Solar panels and batteries are quoted separately after a roof survey. For heat pump system prices see the guide prices.
Towns we cover in Aberdeenshire and Moray
We cover 14 towns in Aberdeenshire and Moray for heat pumps with solar panels and batteries. Each links to local guide prices and the grant position for Scotland.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Aberdeen | AB11 | Portlethen | 6 h 40 min |
| Elgin | IV30 | Forres | 6 h 33 min |
| Peterhead | AB42 | Ellon | 6 h 35 min |
| Banchory | AB31 | Westhill | 6 h 42 min |
| Buckie | AB56 | Elgin | 6 h 32 min |
| Ellon | AB41 | Inverurie | 6 h 37 min |
| Forres | IV36 | Elgin | 6 h 33 min |
| Fraserburgh | AB43 | Peterhead | 6 h 32 min |
| Huntly | AB54 | Turriff | 6 h 36 min |
| Inverurie | AB51 | Westhill | 6 h 38 min |
| Portlethen | AB12 | Aberdeen | 6 h 42 min |
| Stonehaven | AB39 | Portlethen | 6 h 43 min |
| Turriff | AB53 | Huntly | 6 h 34 min |
| Westhill | AB32 | Aberdeen | 6 h 40 min |
Heat pumps with solar panels and batteries questions
How much do solar panels and a battery cost with a heat pump?
Solar PV and batteries are quoted separately from the heat pump, because the price depends on your roof, the number of panels, scaffolding, the inverter and any battery size. We survey the roof and give a written quote for that part of the work. The heat pump itself is priced from its own guide ranges, shown on our prices page.
Can my roof take solar panels?
Most pitched roofs in sound condition can take solar panels, but every roof needs checking. The survey looks at orientation, pitch, shading, roof covering and structure, plus access for scaffolding. Flat roofs can use angled mounting frames. The survey also checks where the inverter and any battery would go and how cables would reach your consumer unit.
Should I fit solar panels before or after a heat pump?
Either order works, but planning both together helps. Knowing the heat pump's electricity use helps size the panels and any battery, and the electrical work for both can be coordinated, including the consumer unit and any notification to the network operator. If you already have panels, the heat pump controls can be set to use their output for hot water.
Do I need a battery to benefit from solar with a heat pump?
No. Without a battery you can still use solar generation directly by timing hot water heating for the middle of the day. A battery adds flexibility by storing surplus for the evening, or by charging from a cheaper overnight tariff in winter. Whether it suits you depends on how much you would otherwise export and on your tariff.

