Most of the practical work is about people. Tenants need notice of the installation days, access to rooms where radiators change and a simple explanation of how to use the controls. We plan the installation in stages where possible, keep the time without heating and hot water as short as practical, and provide handover notes written for tenants.
Shared houses in Aberdeenshire and Moray usually need larger hot water storage to cope with busy mornings. Landlords with let homes in Aberdeenshire and Moray can have each property surveyed and quoted separately or as a group. For tenanted homes in Aberdeenshire and Moray, installation dates and access are agreed in writing before work starts.
Who it suits
- Portfolio landlords planning upgrades across several properties
- Properties between tenancies, when access and disruption are easier to manage
- Landlords who want to remove gas appliances from a property
- HMOs with high hot water demand that need careful cylinder sizing
Grants and rules for heat pumps in Scotland
In Scotland, heat pump funding comes through Home Energy Scotland rather than the Boiler Upgrade Scheme: a grant of up to £7,500 (up to £1,500 extra for eligible rural and island homes) and an optional interest-free loan of up to £7,500. For a home in Aberdeenshire and Moray, apply and receive the written offer before the installation date is fixed.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Scotland has its own permitted development rules for air source heat pumps and its own building standards, so we confirm what applies to your property at survey.
Heat pumps for landlords prices in Aberdeenshire and Moray
The ranges below are typical installed prices for homes in Aberdeenshire and Moray, including VAT. A survey sets the exact figure, because two similar-looking houses in Aberdeenshire and Moray can need quite different radiators and pipework.
| Home | Typical size | Installed guide price |
|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,800–£12,900 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,800–£13,900 |
| 3 bedroom semi or small detached | 6–9 kW | £12,350–£15,950 |
| 4 bedroom detached | 8–12 kW | £14,400–£18,550 |
| 5+ bedroom or larger older house | 11–16 kW | £17,000–£23,200 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. In Scotland, Home Energy Scotland grants of up to £7,500 and interest-free loans may reduce the cost.
Towns we cover in Aberdeenshire and Moray
We cover 14 towns in Aberdeenshire and Moray for landlords and let properties. Each links to local guide prices and the grant position for Scotland.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Aberdeen | AB11 | Portlethen | 6 h 40 min |
| Elgin | IV30 | Forres | 6 h 33 min |
| Peterhead | AB42 | Ellon | 6 h 35 min |
| Banchory | AB31 | Westhill | 6 h 42 min |
| Buckie | AB56 | Elgin | 6 h 32 min |
| Ellon | AB41 | Inverurie | 6 h 37 min |
| Forres | IV36 | Elgin | 6 h 33 min |
| Fraserburgh | AB43 | Peterhead | 6 h 32 min |
| Huntly | AB54 | Turriff | 6 h 36 min |
| Inverurie | AB51 | Westhill | 6 h 38 min |
| Portlethen | AB12 | Aberdeen | 6 h 42 min |
| Stonehaven | AB39 | Portlethen | 6 h 43 min |
| Turriff | AB53 | Huntly | 6 h 34 min |
| Westhill | AB32 | Aberdeen | 6 h 40 min |
Landlords and let properties questions
Can I install a heat pump while tenants are living in the property?
Yes. Most installations typically take 2–4 days on site, with heating and hot water off for part of that time. We agree dates and access with you, provide written details to pass to tenants, and plan the changeover to keep downtime short. Preparing the outdoor unit and cylinder first shortens the period without heating.
Do tenants need training to use a heat pump?
Not training, but a clear explanation helps. Heat pumps are designed to run steadily, with radiators feeling warm rather than hot, so tenants used to boilers may be tempted to switch them off. We provide a handover sheet written for tenants covering the controls, hot water times, what to do if an error appears and why the unit should stay on.
Can a heat pump go on a block of flats or an HMO?
Often, yes, but it needs more planning. In flats, the outdoor unit position and pipe routes usually need freeholder or management company consent, and some positions need planning permission depending on the nation, which we check at survey. In HMOs, hot water demand is higher, so cylinder sizing is critical. Larger buildings may suit a commercial design instead.

