Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
New-build and self-build heat pumps
England · 90 towns

New-build and self-build heat pumps in Greater London

We arrange air source heat pumps for homes throughout Greater London, from the first heat loss survey to commissioning and annual servicing.

A new-build heat pump is an air-to-water system designed into a home while it is on the drawing board or being built, rather than retrofitted later. Because walls, floors and glazing are being chosen at the same time, heat loss can be calculated from the drawings, and the emitters, pipework and cylinder can be planned for a low flow temperature from day one.

Builders working across Greater London can coordinate first and second fix with an installer covering Greater London. Plots in Greater London with tight boundaries benefit from fixing the outdoor unit position before landscaping is finalised. Self-builders in and around Greater London can bring us in at drawing stage so the heat pump, cylinder and pipe routes are designed in from the start.

Who it suits

  • Replacement dwellings and major conversions treated as new homes
  • Small builders and developers working on one-off homes or small groups
  • Architects and builders who want a heat loss design from the drawings
  • Self-builders planning heating alongside the structure

Grants and rules for heat pumps in England

England

In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your quote.

There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.

New-build and self-build heat pumps prices in Greater London

These are guide prices for Greater London, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.

New-build and self-build heat pumps prices in Greater London
HomeTypical sizeInstalled guide price
1–2 bedroom flat or small terrace4–5 kW£10,650–£14,000
2–3 bedroom terrace or semi5–7 kW£11,750–£15,100
3 bedroom semi or small detached6–9 kW£13,450–£17,350
4 bedroom detached8–12 kW£15,700–£20,150
5+ bedroom or larger older house11–16 kW£18,500–£25,200

Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. Most new builds are not eligible for grant funding, so no deduction is shown.

Towns we cover in Greater London

We cover 90 towns in Greater London for new-build and self-build heat pumps. Each links to local guide prices and the grant position for England.

TownPostcode districtNearest townMidwinter daylight
IslingtonN1Highbury7 h 49 min
BexleyDA5Bexleyheath7 h 50 min
BarkingIG11Ilford7 h 49 min
SuttonSM1Carshalton7 h 51 min
CroydonCR0Purley7 h 51 min
IlfordIG1Barking7 h 49 min
HarrowHA1Pinner7 h 49 min
TottenhamN17Wood Green7 h 49 min
WalthamstowE17Leyton7 h 49 min
DagenhamRM10Barking7 h 49 min
RomfordRM1Hornchurch7 h 49 min
HayesUB3Southall7 h 49 min
WembleyHA9Hendon7 h 49 min
FulhamSW6Putney7 h 50 min
SouthallUB1Hayes7 h 49 min
PutneySW15Fulham7 h 50 min
BatterseaSW11Chelsea7 h 50 min
PurleyCR8Coulsdon7 h 51 min
PeckhamSE15Dulwich7 h 50 min
ChingfordE4Woodford Green7 h 48 min
UxbridgeUB8Ruislip7 h 49 min
WimbledonSW19Morden7 h 50 min
BrixtonSW2Clapham7 h 50 min
HounslowTW3Twickenham7 h 50 min
FinchleyN3Hendon7 h 49 min
MitchamCR4Morden7 h 51 min
FelthamTW13Hounslow7 h 50 min
ActonW3Chiswick7 h 49 min
BeckenhamBR3Bromley7 h 50 min
ChelseaSW3Battersea7 h 50 min
StreathamSW16Balham7 h 50 min
ElthamSE9Blackheath7 h 50 min
MordenSM4Mitcham7 h 51 min
CarshaltonSM5Sutton7 h 51 min
CatfordSE6Lewisham7 h 50 min
SurbitonKT6Kingston upon Thames7 h 51 min
StratfordE15Leyton7 h 49 min
ChiswickW4Acton7 h 50 min
RuislipHA4Pinner7 h 49 min
GreenwichSE10Blackheath7 h 50 min
BarnetEN5Mill Hill7 h 48 min
Wood GreenN22Crouch End7 h 49 min
Muswell HillN10Crouch End7 h 49 min
HighburyN5Islington7 h 49 min
CoulsdonCR5Purley7 h 51 min
HornchurchRM11Upminster7 h 49 min
BlackheathSE3Lewisham7 h 50 min
New MaldenKT3Kingston upon Thames7 h 51 min
Woodford GreenIG8Chingford7 h 48 min
RichmondTW9Twickenham7 h 50 min
BarnesSW13Putney7 h 50 min
Notting HillW11Kensington7 h 49 min
PinnerHA5Harrow7 h 49 min
Golders GreenNW11Hampstead7 h 49 min
TootingSW17Balham7 h 50 min
ChislehurstBR7Sidcup7 h 50 min
OrpingtonBR6Chislehurst7 h 51 min
BalhamSW12Tooting7 h 50 min
BexleyheathDA6Bexley7 h 50 min
BromleyBR1Beckenham7 h 51 min
CamdenNW1Kentish Town7 h 49 min
ClaphamSW4Brixton7 h 50 min
Crouch EndN8Highgate7 h 49 min
DulwichSE21Brixton7 h 50 min
EalingW5Acton7 h 49 min
EdgwareHA8Mill Hill7 h 48 min
EnfieldEN1Southgate7 h 48 min
Forest HillSE23Sydenham7 h 50 min
HackneyE8Stoke Newington7 h 49 min
HammersmithW6Notting Hill7 h 50 min
HampsteadNW3West Hampstead7 h 49 min
HendonNW4Golders Green7 h 49 min
HighgateN6Crouch End7 h 49 min
KensingtonW8Notting Hill7 h 50 min
Kentish TownNW5Camden7 h 49 min
Kingston upon ThamesKT1Surbiton7 h 50 min
LewishamSE13Blackheath7 h 50 min
LeytonE10Walthamstow7 h 49 min
Mill HillNW7Edgware7 h 48 min
SidcupDA14Chislehurst7 h 50 min
SouthgateN14Enfield7 h 48 min
Stoke NewingtonN16Highbury7 h 49 min
SydenhamSE26Forest Hill7 h 50 min
TeddingtonTW11Twickenham7 h 50 min
TwickenhamTW1Teddington7 h 50 min
UpminsterRM14Hornchurch7 h 49 min
WandsworthSW18Putney7 h 50 min
WansteadE11Leyton7 h 49 min
West HampsteadNW6Hampstead7 h 49 min
WoolwichSE18Eltham7 h 50 min

New-build and self-build heat pumps questions

When do you need to be involved in a new build?

Ideally before the drawings are finalised, so the plant space, outdoor unit position and emitters are agreed with your architect. At the latest, the design should be done before first fix, when pipework goes in under floors and inside walls. Late involvement usually means compromises, such as a cylinder in an awkward space or pipe runs boxed in afterwards.

Where should the outdoor unit go on a new build?

Somewhere with free airflow, a solid base and drainage, away from bedroom windows and boundaries where possible, and positioned to pass the MCS noise assessment. On a new build this can be planned into the landscaping, such as a side return or screened area near the plant room, which keeps pipe runs short. Planning rules differ by nation, so we check the position at design stage.

Do new builds have to have a heat pump?

The rules depend on the nation and when your project was approved, so check with your architect or building control. New homes in England are being built to tighter carbon standards, and Wales, Scotland and Northern Ireland set their own building regulations. A heat pump is one of the main ways new homes meet these standards, and we design the heating to whichever applies.

Can a self-build get the Boiler Upgrade Scheme grant?

In some cases. In England and Wales the scheme is aimed at existing homes and most new builds are not eligible, but some self-builds can qualify depending on circumstances, so check eligibility before including a grant in your budget. If the scheme can apply, the MCS-certified installer named in your quote handles the application. Scotland and Northern Ireland are outside the scheme.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote