- Area
- Merseyside
- Postcode district
- CH45
- Nation
- England
- Nearby
- Birkenhead, Bootle, Liverpool
Homes in Wallasey and the wider CH45 district can book a free survey for installation enquiries. Nearby we also cover Birkenhead (about 3 miles south-east) and Bootle.
Heat pump services in Wallasey
All services in Wallasey:
Grants and rules for heat pumps in England
In England the Boiler Upgrade Scheme gives £7,500 towards an air source heat pump (£9,000 if it replaces oil or LPG, from 21 July 2026 to 31 March 2027), and since 28 April 2026 a valid EPC is no longer needed. The grant is applied for by the MCS-certified installer and shown as a deduction on your Wallasey quote.
There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.
Heat pump guide prices in Wallasey
Guide prices for Wallasey and the rest of Merseyside are shown below, installed and inc VAT. We publish ranges rather than a single figure because design details move the price, and the written quote after survey fixes it.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,200–£12,150 | £1,700–£4,650 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,200–£13,100 | £2,700–£5,600 |
| 3 bedroom semi or small detached | 6–9 kW | £11,650–£15,050 | £4,150–£7,550 |
| 4 bedroom detached | 8–12 kW | £13,600–£17,450 | £6,100–£9,950 |
| 5+ bedroom or larger older house | 11–16 kW | £16,000–£21,850 | £8,500–£14,350 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Designing for Wallasey's winters
On the shortest day Wallasey gets only about 7 hours 29 minutes of daylight and the noon sun sits around 13° above the horizon. Northern winters tend to be longer, so a well-designed, efficient system matters more here because it runs for more of the year.
Heat pumps in Wallasey: questions
How long does a heat pump survey take in Wallasey?
A home survey in Wallasey usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.
How soon can you survey a home in Wallasey?
Survey dates depend on how busy installers are in Merseyside. We offer the next available dates when you enquire and confirm them in writing.
How long does installation take in Wallasey?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Wallasey home states the expected time.
Do you cover Birkenhead as well as Wallasey?
Yes. We arrange surveys and installation in Birkenhead, which is about 3 miles south-east of Wallasey, and across Merseyside.

