Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
New-build and self-build heat pumps
England · 14 towns

New-build and self-build heat pumps in Merseyside

Air source heat pump installation, servicing and repairs across Merseyside: free home surveys for installation enquiries, guide prices online and fixed written quotes.

Most new builds are not eligible for the Boiler Upgrade Scheme in England and Wales. Some self-builds can be, depending on the circumstances, so check eligibility before relying on a grant in your budget. In Scotland, ask Home Energy Scotland about new homes; Northern Ireland has no dedicated homeowner heat pump grant at present.

Builders working across Merseyside can coordinate first and second fix with an installer covering Merseyside. Self-builders in and around Merseyside can bring us in at drawing stage so the heat pump, cylinder and pipe routes are designed in from the start. New homes in Merseyside designed with underfloor heating downstairs get a low flow temperature that suits a heat pump.

Who it suits

  • Self-builders planning heating alongside the structure
  • Small builders and developers working on one-off homes or small groups
  • Replacement dwellings and major conversions treated as new homes
  • Homes designed with underfloor heating on one or more floors

Grants and rules for heat pumps in England

England

Homes in Merseyside can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.

There is no VAT on installing a heat pump anywhere in the UK until 31 March 2027. In England most houses can have an air source heat pump under permitted development, provided the unit meets the MCS noise and siting standards; the old 1 m boundary limit was removed on 29 May 2025. We flag listed buildings, flats and sensitive conservation-area positions at survey.

New-build and self-build heat pumps prices in Merseyside

The ranges below are typical installed prices for homes in Merseyside, including VAT. A survey sets the exact figure, because two similar-looking houses in Merseyside can need quite different radiators and pipework.

New-build and self-build heat pumps prices in Merseyside
HomeTypical sizeInstalled guide price
1–2 bedroom flat or small terrace4–5 kW£9,200–£12,150
2–3 bedroom terrace or semi5–7 kW£10,200–£13,100
3 bedroom semi or small detached6–9 kW£11,650–£15,050
4 bedroom detached8–12 kW£13,600–£17,450
5+ bedroom or larger older house11–16 kW£16,000–£21,850

Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. Most new builds are not eligible for grant funding, so no deduction is shown.

Towns we cover in Merseyside

We cover 14 towns in Merseyside for new-build and self-build heat pumps. Each links to local guide prices and the grant position for England.

TownPostcode districtNearest townMidwinter daylight
LiverpoolL3Birkenhead7 h 29 min
BirkenheadCH41Liverpool7 h 29 min
St HelensWA10Prescot7 h 29 min
SouthportPR8Formby7 h 26 min
WallaseyCH45Birkenhead7 h 29 min
BootleL21Wallasey7 h 28 min
BebingtonCH63Birkenhead7 h 30 min
HuytonL36Prescot7 h 29 min
KirkbyL32Maghull7 h 28 min
PrescotL34Huyton7 h 29 min
HeswallCH60Bebington7 h 30 min
MaghullL31Kirkby7 h 28 min
FormbyL37Maghull7 h 27 min
HalewoodL26Huyton7 h 30 min

New-build and self-build heat pumps questions

Is underfloor heating worth it in a new build?

For many new homes, yes, because underfloor heating runs at low water temperatures that suit a heat pump, and laying pipes during the build is far easier than adding them later. It also frees up wall space. Radiators cost less and respond faster, so some self-builders combine underfloor heating downstairs with radiators upstairs. The design shows the flow temperature each option needs.

How long does a new-build heat pump installation take?

It is split across the build. First fix typically takes a few days once the structure is up, and second fix with commissioning takes a few more days near completion. Underfloor heating in screed then follows a gradual drying-out schedule. Exact timing depends on your build programme, which we agree with your builder so trades are not left waiting on each other.

Can a self-build get the Boiler Upgrade Scheme grant?

In some cases. In England and Wales the scheme is aimed at existing homes and most new builds are not eligible, but some self-builds can qualify depending on circumstances, so check eligibility before including a grant in your budget. If the scheme can apply, the MCS-certified installer named in your quote handles the application. Scotland and Northern Ireland are outside the scheme.

When do you need to be involved in a new build?

Ideally before the drawings are finalised, so the plant space, outdoor unit position and emitters are agreed with your architect. At the latest, the design should be done before first fix, when pipework goes in under floors and inside walls. Late involvement usually means compromises, such as a cylinder in an awkward space or pipe runs boxed in afterwards.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote