Most new builds are not eligible for the Boiler Upgrade Scheme in England and Wales. Some self-builds can be, depending on the circumstances, so check eligibility before relying on a grant in your budget. In Scotland, ask Home Energy Scotland about new homes; Northern Ireland has no dedicated homeowner heat pump grant at present.
Plots in County Antrim with tight boundaries benefit from fixing the outdoor unit position before landscaping is finalised. Self-builders in and around County Antrim can bring us in at drawing stage so the heat pump, cylinder and pipe routes are designed in from the start. For barn conversions and replacement dwellings near County Antrim, the design starts from the specification of the new walls, floors and glazing.
Who it suits
- Self-builders planning heating alongside the structure
- Replacement dwellings and major conversions treated as new homes
- Homes designed with underfloor heating on one or more floors
- Architects and builders who want a heat loss design from the drawings
Grants and rules for heat pumps in Northern Ireland
Northern Ireland does not have a dedicated heat pump grant for homeowners at present, and the Boiler Upgrade Scheme does not apply here. Heat pumps have sometimes been funded through the Northern Ireland Sustainable Energy Programme, so it is worth checking what is open when you enquire about a home in County Antrim.
There is no VAT on installing a heat pump in Northern Ireland until 31 March 2027, the same as in Great Britain. Planning and building control here follow Northern Ireland's own rules, so the survey checks the unit position against them.
New-build and self-build heat pumps prices in County Antrim
These are guide prices for County Antrim, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.
| Home | Typical size | Installed guide price |
|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,200–£12,150 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,200–£13,100 |
| 3 bedroom semi or small detached | 6–9 kW | £11,650–£15,050 |
| 4 bedroom detached | 8–12 kW | £13,600–£17,450 |
| 5+ bedroom or larger older house | 11–16 kW | £16,000–£21,850 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. Most new builds are not eligible for grant funding, so no deduction is shown. No dedicated heat pump grant currently applies in Northern Ireland.
Towns we cover in County Antrim
We cover 11 towns in County Antrim for new-build and self-build heat pumps. Each links to local guide prices and the grant position for Northern Ireland.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Belfast | BT1 | Newtownabbey | 7 h 15 min |
| Lisburn | BT27 | Belfast | 7 h 16 min |
| Newtownabbey | BT37 | Belfast | 7 h 14 min |
| Carrickfergus | BT38 | Newtownabbey | 7 h 13 min |
| Ballymena | BT42 | Antrim | 7 h 12 min |
| Antrim | BT41 | Ballyclare | 7 h 13 min |
| Larne | BT40 | Carrickfergus | 7 h 12 min |
| Ballycastle | BT54 | Ballymoney | 7 h 07 min |
| Ballyclare | BT39 | Antrim | 7 h 13 min |
| Ballymoney | BT53 | Coleraine | 7 h 09 min |
| Portrush | BT56 | Portstewart | 7 h 07 min |
New-build and self-build heat pumps questions
Do new builds have to have a heat pump?
The rules depend on the nation and when your project was approved, so check with your architect or building control. New homes in England are being built to tighter carbon standards, and Wales, Scotland and Northern Ireland set their own building regulations. A heat pump is one of the main ways new homes meet these standards, and we design the heating to whichever applies.
Is underfloor heating worth it in a new build?
For many new homes, yes, because underfloor heating runs at low water temperatures that suit a heat pump, and laying pipes during the build is far easier than adding them later. It also frees up wall space. Radiators cost less and respond faster, so some self-builders combine underfloor heating downstairs with radiators upstairs. The design shows the flow temperature each option needs.
When do you need to be involved in a new build?
Ideally before the drawings are finalised, so the plant space, outdoor unit position and emitters are agreed with your architect. At the latest, the design should be done before first fix, when pipework goes in under floors and inside walls. Late involvement usually means compromises, such as a cylinder in an awkward space or pipe runs boxed in afterwards.
How long does a new-build heat pump installation take?
It is split across the build. First fix typically takes a few days once the structure is up, and second fix with commissioning takes a few more days near completion. Underfloor heating in screed then follows a gradual drying-out schedule. Exact timing depends on your build programme, which we agree with your builder so trades are not left waiting on each other.

