Air source heat pumps, surveyed, designed and installed· Free home survey for installation enquiries
0800 088 6341
New-build and self-build heat pumps
Northern Ireland · 7 towns

New-build and self-build heat pumps in County Londonderry

Switching to a heat pump in County Londonderry? Start with a guide price, then a surveyor measures your home and the written quote fixes the price.

A new-build heat pump is an air-to-water system designed into a home while it is on the drawing board or being built, rather than retrofitted later. Because walls, floors and glazing are being chosen at the same time, heat loss can be calculated from the drawings, and the emitters, pipework and cylinder can be planned for a low flow temperature from day one.

Plots in County Londonderry with tight boundaries benefit from fixing the outdoor unit position before landscaping is finalised. Self-builders in and around County Londonderry can bring us in at drawing stage so the heat pump, cylinder and pipe routes are designed in from the start. Small developments near County Londonderry can be designed plot by plot, with heat loss worked out from each house type's drawings.

Who it suits

  • Homes designed with underfloor heating on one or more floors
  • Replacement dwellings and major conversions treated as new homes
  • Architects and builders who want a heat loss design from the drawings
  • Self-builders planning heating alongside the structure

Grants and rules for heat pumps in Northern Ireland

Northern Ireland

Northern Ireland does not have a dedicated heat pump grant for homeowners at present, and the Boiler Upgrade Scheme does not apply here. Heat pumps have sometimes been funded through the Northern Ireland Sustainable Energy Programme, so it is worth checking what is open when you enquire about a home in County Londonderry.

There is no VAT on installing a heat pump in Northern Ireland until 31 March 2027, the same as in Great Britain. Planning and building control here follow Northern Ireland's own rules, so the survey checks the unit position against them.

New-build and self-build heat pumps prices in County Londonderry

These are guide prices for County Londonderry, installed and including VAT. Your final price is fixed in a written quote after the survey and depends on the heat loss of the house, the radiators that need changing and where the unit goes.

New-build and self-build heat pumps prices in County Londonderry
HomeTypical sizeInstalled guide price
1–2 bedroom flat or small terrace4–5 kW£9,200–£12,150
2–3 bedroom terrace or semi5–7 kW£10,200–£13,100
3 bedroom semi or small detached6–9 kW£11,650–£15,050
4 bedroom detached8–12 kW£13,600–£17,450
5+ bedroom or larger older house11–16 kW£16,000–£21,850

Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. Most new builds are not eligible for grant funding, so no deduction is shown. No dedicated heat pump grant currently applies in Northern Ireland.

Towns we cover in County Londonderry

We cover 7 towns in County Londonderry for new-build and self-build heat pumps. Each links to local guide prices and the grant position for Northern Ireland.

TownPostcode districtNearest townMidwinter daylight
Derry/LondonderryBT48Limavady7 h 10 min
ColeraineBT52Portstewart7 h 08 min
DungivenBT47Limavady7 h 11 min
LimavadyBT49Dungiven7 h 09 min
MagheraBT46Magherafelt7 h 12 min
MagherafeltBT45Maghera7 h 13 min
PortstewartBT55Coleraine7 h 08 min

New-build and self-build heat pumps questions

Where should the outdoor unit go on a new build?

Somewhere with free airflow, a solid base and drainage, away from bedroom windows and boundaries where possible, and positioned to pass the MCS noise assessment. On a new build this can be planned into the landscaping, such as a side return or screened area near the plant room, which keeps pipe runs short. Planning rules differ by nation, so we check the position at design stage.

How long does a new-build heat pump installation take?

It is split across the build. First fix typically takes a few days once the structure is up, and second fix with commissioning takes a few more days near completion. Underfloor heating in screed then follows a gradual drying-out schedule. Exact timing depends on your build programme, which we agree with your builder so trades are not left waiting on each other.

When do you need to be involved in a new build?

Ideally before the drawings are finalised, so the plant space, outdoor unit position and emitters are agreed with your architect. At the latest, the design should be done before first fix, when pipework goes in under floors and inside walls. Late involvement usually means compromises, such as a cylinder in an awkward space or pipe runs boxed in afterwards.

Is underfloor heating worth it in a new build?

For many new homes, yes, because underfloor heating runs at low water temperatures that suit a heat pump, and laying pipes during the build is far easier than adding them later. It also frees up wall space. Radiators cost less and respond faster, so some self-builders combine underfloor heating downstairs with radiators upstairs. The design shows the flow temperature each option needs.

Ready to price your heat pump?

Use the guide price tool, or book a free home survey and fixed written quote.

CallGet a quote