Most new builds are not eligible for the Boiler Upgrade Scheme in England and Wales. Some self-builds can be, depending on the circumstances, so check eligibility before relying on a grant in your budget. In Scotland, ask Home Energy Scotland about new homes; Northern Ireland has no dedicated homeowner heat pump grant at present.
Self-builders in and around Renfrewshire and Inverclyde can bring us in at drawing stage so the heat pump, cylinder and pipe routes are designed in from the start. Builders working across Renfrewshire and Inverclyde can coordinate first and second fix with an installer covering Renfrewshire and Inverclyde. New homes in Renfrewshire and Inverclyde designed with underfloor heating downstairs get a low flow temperature that suits a heat pump.
Who it suits
- Small builders and developers working on one-off homes or small groups
- Homes designed with underfloor heating on one or more floors
- Architects and builders who want a heat loss design from the drawings
- Replacement dwellings and major conversions treated as new homes
Grants and rules for heat pumps in Scotland
The Boiler Upgrade Scheme does not apply in Scotland. Instead, homeowners in Renfrewshire and Inverclyde can apply to Home Energy Scotland for a grant of up to £7,500 towards a heat pump, with up to £1,500 more for eligible rural and island homes, plus an optional interest-free loan of up to £7,500. You need a written funding offer before any work starts.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Scotland has its own permitted development rules for air source heat pumps and its own building standards, so we confirm what applies to your property at survey.
New-build and self-build heat pumps prices in Renfrewshire and Inverclyde
Here are typical prices for new-build and self-build heat pumps in Renfrewshire and Inverclyde, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.
| Home | Typical size | Installed guide price |
|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,500–£12,500 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,500–£13,500 |
| 3 bedroom semi or small detached | 6–9 kW | £12,000–£15,500 |
| 4 bedroom detached | 8–12 kW | £14,000–£18,000 |
| 5+ bedroom or larger older house | 11–16 kW | £16,500–£22,500 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning. Most new builds are not eligible for grant funding, so no deduction is shown.
Towns we cover in Renfrewshire and Inverclyde
We cover 10 towns in Renfrewshire and Inverclyde for new-build and self-build heat pumps. Each links to local guide prices and the grant position for Scotland.
| Town | Postcode district | Nearest town | Midwinter daylight |
|---|---|---|---|
| Paisley | PA2 | Barrhead | 6 h 59 min |
| Greenock | PA15 | Gourock | 6 h 57 min |
| Newton Mearns | G77 | Barrhead | 7 h 00 min |
| Renfrew | PA4 | Erskine | 6 h 58 min |
| Barrhead | G78 | Paisley | 6 h 59 min |
| Johnstone | PA5 | Bridge of Weir | 6 h 59 min |
| Erskine | PA8 | Renfrew | 6 h 58 min |
| Bridge of Weir | PA11 | Johnstone | 6 h 59 min |
| Gourock | PA19 | Greenock | 6 h 57 min |
| Port Glasgow | PA14 | Greenock | 6 h 58 min |
New-build and self-build heat pumps questions
Is underfloor heating worth it in a new build?
For many new homes, yes, because underfloor heating runs at low water temperatures that suit a heat pump, and laying pipes during the build is far easier than adding them later. It also frees up wall space. Radiators cost less and respond faster, so some self-builders combine underfloor heating downstairs with radiators upstairs. The design shows the flow temperature each option needs.
Do new builds have to have a heat pump?
The rules depend on the nation and when your project was approved, so check with your architect or building control. New homes in England are being built to tighter carbon standards, and Wales, Scotland and Northern Ireland set their own building regulations. A heat pump is one of the main ways new homes meet these standards, and we design the heating to whichever applies.
Can a self-build get the Boiler Upgrade Scheme grant?
In some cases. In England and Wales the scheme is aimed at existing homes and most new builds are not eligible, but some self-builds can qualify depending on circumstances, so check eligibility before including a grant in your budget. If the scheme can apply, the MCS-certified installer named in your quote handles the application. Scotland and Northern Ireland are outside the scheme.
When do you need to be involved in a new build?
Ideally before the drawings are finalised, so the plant space, outdoor unit position and emitters are agreed with your architect. At the latest, the design should be done before first fix, when pipework goes in under floors and inside walls. Late involvement usually means compromises, such as a cylinder in an awkward space or pipe runs boxed in afterwards.