- Area
- Kent
- Postcode district
- ME2
- Nation
- England
- Nearby
- Rochester, Gillingham, Gravesend
Homes in Strood and the wider ME2 district can book a free survey for installation enquiries. Nearby we also cover Rochester (about a mile east) and Gillingham.
Heat pump services in Strood
All services in Strood:
Grants and rules for heat pumps in England
Homes in Strood can use the Boiler Upgrade Scheme, which takes £7,500 off the cost of an air source heat pump when it replaces fossil-fuel or electric heating. Replacing oil or LPG heating qualifies for £9,000 for installations from 21 July 2026 to 31 March 2027, and air-to-air systems for £2,500. The MCS-certified installer named in your quote applies for the grant and deducts it from the price.
Installing heat pumps is zero-rated for VAT across the UK until 31 March 2027. Since 29 May 2025, permitted development in England allows up to two air source heat pumps on a house, each up to 1.5 m³, with no blanket 1 m boundary rule — the installation must still meet the MCS planning standards, including the noise check. Listed buildings, flats and some conservation-area positions need extra consent, which we check at survey.
Heat pump guide prices in Strood
Here are typical prices for an air source heat pump in Kent, installed and including VAT. Use the guide price tool for a figure based on your home, then a survey confirms it in writing.
| Home | Typical size | Installed guide price | After £7,500 grant |
|---|---|---|---|
| 1–2 bedroom flat or small terrace | 4–5 kW | £9,800–£12,900 | £2,300–£5,400 |
| 2–3 bedroom terrace or semi | 5–7 kW | £10,800–£13,900 | £3,300–£6,400 |
| 3 bedroom semi or small detached | 6–9 kW | £12,350–£15,950 | £4,850–£8,450 |
| 4 bedroom detached | 8–12 kW | £14,400–£18,550 | £6,900–£11,050 |
| 5+ bedroom or larger older house | 11–16 kW | £17,000–£23,200 | £9,500–£15,700 |
Installed, inc VAT: unit, cylinder, controls, minor pipework and commissioning.
Designing for Strood's winters
On the shortest day Strood gets about 7 hours 51 minutes of daylight, and the winter sun reaches only around 15° above the horizon at noon. Winters this far south are milder than in most of the UK, which helps a heat pump run at low flow temperatures for much of the season.
Heat pumps in Strood: questions
Where would the outdoor unit go on a Strood house?
Usually at the side or rear, on a level base with space around it for airflow and servicing, away from bedroom windows where possible. The surveyor checks positions at your Strood home.
How soon can you survey a home in Strood?
Survey dates depend on how busy installers are in Kent. We offer the next available dates when you enquire and confirm them in writing.
How long does installation take in Strood?
Most installations take 2–4 days on site. Jobs with several radiator changes or new pipework take longer, and your quote for a Strood home states the expected time.
How long does a heat pump survey take in Strood?
A home survey in Strood usually takes one to two hours. The surveyor measures every heated room, checks windows, walls and radiators, and looks at where the outdoor unit and cylinder can go.

